TUGMAN22.WPF Page 1 <br /> July 11, 1995 <br /> Elizabeth Orr <br /> 290 East 36th Street <br /> Eugene, OR 97405 <br /> Dear Ms . Orr: <br /> In follow-up to my June 9, 1995, letter and your letter of June 25, <br /> 1995 . You ask for "assurances that the pipe and fill operation at <br /> Tugman Park will not adversely affect the adjoining properties in any <br /> way. " <br /> The plans for extension of the storm drain pipe, to reduce erosion and <br /> water flow contacting the toe of the landfill, have been designed by <br /> the City Engineers . This design has been reviewed by Department of <br /> Environmental Quality staff and staff at Parametrix, including a <br /> hydrogeologist . There will not as a result of this work, be any <br /> additional water volume added to the current drainage system. <br /> There are some additional measures being undertaken to improve the <br /> current storm drain and channel performance . At the pipe outfall , a <br /> structure will be built to reduce the speed of the water as it exits <br /> from the storm drain pipe. This summer Park Service crews will be <br /> mowing the grass between the fence to the west of the creek and the <br /> creek. In addition, the crews will hand clear the brush and debris that <br /> is along the creek bed. This will allow observation of the creek bed <br /> during periods of water flow and if additional improvements to the <br /> drainage system are required, allow for proper planning and design of <br /> those improvements . <br /> If you have any further questions please feel free to contact this <br /> office. <br /> Sincerely, <br /> Chuck Solin <br /> Loss Control/Environmental Program Manager <br />