Erosion control and refrnenierrt of drama 7e atterns; <br /> City staff continued to assess functioning of the reftned drainage outlet on the east <br /> side of the site, overland water flow, and filling of vernal pools this winter. <br /> Native dant materials rocurenient: City staff continued to plan and procure native <br /> seed needed for the site via contracts with Heritage Seedlings, Inc. and coordination <br /> other local growers, such as Pacific Northwest Natives. <br /> The status of the agreement is provided in the table below: <br /> Maximum amount to be rehnbti sed to the City: $1,182,000.00 <br /> Total billed previous : $314,073.23 <br /> Anlotlnt billed this period: 1/01/2015 --3/31/2015 $801.00 <br /> Total billed to date: $314,874.23 <br /> Total remainin $SG7,[25.77 <br /> If you have any questions, please don't hesitate to contact me at (541)682-4927. <br />