VEHICLE TIME (Same as Total Field Time) <br />Total Vehicle Time ........... 90 min <br />SUPERVISOR'S TIME <br />Typical Time Involving Supervisor .......... 30 min <br />The following is the costing of the total inspection, research, mailing, <br />supervision, and vehicle time required to perform a typical developed property <br />vegetation abatement as of the date of this memo. <br />COST CALCUALTION <br />WAGES <br />Inspector Time = 3.75 hrs @ $ 11.60 x 1.36(fringe) = $ 59.16 <br />Supervisor Time = .5 hrs @ $ 16.53 x 1.325(fringe) = 10.95 <br />Subtotal = $ 70.11 <br />x 1.328(indirect rate)* = $ 93.11 <br />VEHICLE <br />Sedan Time = 1.50 hrs @ $ 5.00 = $ 7.50 <br />DIRECT EXPENSES <br />Initial letter postage .. ..............................$ .25 <br />Certified posting postage .............................$ 2.30 <br />Certified invoice postage .............................$ 2.30 <br />Film & developing costs (8 prints) ................... $ 3.25 <br />$ 8.10 <br />Material & Cash Total = 8.10 <br />TOTAL MAINTENANCE DIVISION ADMINISTRATIVE COSTS = $ 110.00 <br />* Indirect rate paid for ASD support (Personnel, Finance, Etc.) <br />