EUGENE SCHOOL DISTRICT 4J - MULTI -USE ATHLETIC FIELDS STUDY <br /> PROJECT COST SUMMARY FEBRUARY 4, 1999 <br /> OPTION 1 - FOUR SEPARATE FIELDS <br /> SOUTH EUGENE HIGH SCHOOL - ON EXISTING FIELDS NORTH OF TRACK <br /> A B C D E F <br /> BASIC BASIC FIELD ADD ADO ADD ALL <br /> FIELD & UTILITY BLEACHERS ADDITIONAL RESTROOMS & FEATURES <br /> COSTS SERVICES & LIGHTS COMPONENTS CONCESSIONS INCLUDED <br /> BASIC FIELD COMPONENTS <br /> 1 FIELD ENGINEERING 38,290 $8,290 $8,290 $8,290 $8,290 $8,290 <br /> 2 FIELD SURFACE AND DRAINAGE $942,597 3942,597 3942,597 $942,597 3942,597 $942,597 <br /> 3 CHAIN LINK FENCE AND GATES $25,813 $25,813 $25,813 $25,813 $25,813 $25,813 <br /> 4 PAVEMENT BETWEEN FENCE AND FIELD 3122,173 $122,173 3122,173 $122,173 $122,173 $122,173 <br /> 5 WALKWAY BETWEEN PARKING AND FIELD $0 30 $0 $0 $0 $0 <br /> 6 EMERGENCY AND SERVICE VEHICLE ACCESS $0 $0 $0 $0 $0 $0 <br /> 7 TRACK AND FIELD AMENITIES REPLACEMENT $16,499 $16,499 316,499 $16,499 $16,499 $16,499 <br /> 8 GOAL POSTS $5,638 35,638 $5,638 $5,638 $5,638 $5,638 <br /> I SUB -TOTAL BASIC FIELD COMPONENTS $1,121,010 <br /> BASIC UTILITY SERVICES ROUGH -IN <br /> 9 ADD FIRE WATER UTILITY SERVICE 30 $0 $0 $0 $0 <br /> 10 ADD ELECTRICAL UTILITY SERVICE $36,571 $36,571 $36,571 $36,571 $36,571 <br /> I SUB -TOTAL BASIC FIELD COMPONENTS & UTILITY ROUGH -IN 31,157,581 <br /> ADDITIONAL PROJECT ENHANCEMENTS <br /> ADD BLEACHERS AND FIELD LIGHTING <br /> 11 ADD 1000 SEAT GRANDSTAND $194,703 3194,703 $194,703 $194,703 <br /> 12 ADD ELEVATOR TO OBSERVATION BOOTH $0 $0 $0 $0 <br /> 13 ADD FIELD LIGHTING $127,535 $127,535 $127,535 $127,535 <br /> I SUB -TOTAL BASIC FIELD COMP. & UTILITY ROUGH -IN & BLEACHERS & LIGHTING $1,479,819 <br /> ADD OTHER PROPOSED PROJECT AMENITIES <br /> 14 ADD SCORE BOARD $23,312 $23,312 $23,312 <br /> 15 ADD ACOUSTICAL SOUND SYSTEM $18,794 $18,794 $18,794 <br /> 16 ADD DUMPSTER STORAGE AREA $6,172 $6,172 $6,172 <br /> ADD ADDITIONAL COMPONENTS 31,528,097 <br /> ADD REST ROOM FACILITIES <br /> 17 ADD RESTROOM FACILITIES $278,154 $278,154 <br /> 18 ADD CONCESSION BUILDING $72,899 $72,899 <br /> 19 ADD SANITARY SEWER UTILITY SERVICE $16,048 $16,048 <br /> 20 ADD DOMESTIC WATER UTILITY SERVICE $4,475 $4,475 <br /> I SUB -TOTAL FIELDS & UTILITY ROUGH-IN & BLEACHERS & LIGHTING & RESTROOMS $1,899,673 <br /> REMAINING PROJECT COMPONENTS <br /> 21 ADD WALKWAY LIGHTING BETWEEN PARKING AND FIELD $69,285 <br /> I. TOTAL PROJECT COSTS FOR ALL PROJECT COMPONENTS 31,968,958 <br /> WBGS ARCHITECTURE PLANNING PC 2/4/99 <br /> PROJECT COST SUMMARY PAGE 5 <br />