• <br /> r MC CAMERON - MCCARTHY <br /> IVI GILBERT & SCHEIBE <br /> LANDSCAPE ARCHITECTS LLP <br /> IN 541 4 -7385 <br /> K. 160 Eari 67:6"477 Fm 571 485.7389 <br /> E ug e ne. OR 97401 cmgs ®usnest.net <br /> COMMUNITY GREEN <br /> LANE COUNTY FAIRGROUNDS - EUGENE, OREGON <br /> October 23, 2002 <br /> MASTER PLAN PHASE <br /> STATEMENT OF PRELIMINARY CONSTRUCTION COSTS <br /> Project Area = 435,900 sf <br /> QUAN UNIT PRICE COST TOTALS <br /> "HARDSCAPE" <br /> Earthwork @ hardscape areas 86100 sf $0.20 $17,220 <br /> Asphalt paving 57400 sf $3.00 $172,200 <br /> (Includes storm drainage) <br /> Concrete paving 28700 sf $4.75 $136,325 <br /> Fencing 1800 if $12.00 $21,600 <br /> Lighting 30 allow $2,000.00 $60,000 <br /> Site Furnishings 1 allow $40,000.00 $40,000 <br /> (Includes benches, flag poles, bollards, litter receptacles, signage, bike racks and play structure) <br /> $447,345 <br /> "LANDSCAPE" <br /> Earthwork @ landscape areas 349800 sf $0.10 $34,980 <br /> Topsoil 9444 cy $9.00 $85,000 <br /> Irrigation @ plantbeds 13000 sf $1.50 $19,500 <br /> Irrigation @ finish lawns 242000 sf $1.00 $242,000 <br /> Planting @ plantbeds 13000 sf $2.50 $32,500 <br /> (Includes soil preparation, finish grading, plant material, and mulch) <br /> Finish lawns 242000 sf $0.60 $145,200 <br /> (Includes soil preparation, finish grading, seeding and establishment) <br /> Rough lawns (non - irrigated) 76600 sf $0.10 $7,660 <br /> Reinforced Lawn 6700 sf $5.00 $33,500 <br /> Natural Path 8500 sf $2.00 $17,000 <br /> Deciduous Tree 73 ea $250.00 $18,250 <br /> Coniferous Tree 8 ea $175.00 $1,400 <br /> $636,990 <br /> Total - Direct <br /> Construction Cost (DCC) $1,084,335 <br /> Total - Indirect <br /> Construction Cost (15% of DCC) $162,650 <br /> Total Base Bid Construction Cost - Community Green $1,246,985 <br /> • This estimate does not any Owner(s) costs. <br />