New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium, October 1999 Forward
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
4J Stadium, October 1999 Forward
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2014 10:07:13 AM
Creation date
8/7/2014 10:06:43 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L ■\Qs LOA <br /> Youth Sports Parks /4j Athletic Fields <br /> PROPOSAL <br /> Selection Criteria <br /> WBGS WRG <br /> Team Team <br /> Qualifications <br /> Firm Organization Experience Nature of work generally performed by firm <br /> and major subconsultants. Annual gross <br /> receipts for the last five years for the <br /> architecture and landscape architecture firms <br /> on your team. Number of licensed archiects <br /> and landscape architects. Availability of firm a.M <br /> and subconsultatns to perform work within <br /> required time frame. � 7 6 <br /> Personnel Assigned to Project Key personnel from firm and subconsultants. <br /> Skateboard design specialist required. <br /> Percentage of each peron's total time <br /> dedicated to project during design period and <br /> construction admin period. Who will be <br /> doing bulk of design work for each firm. <br /> Resumes for all personnel listed. <br /> Special Qualifications Special qualifications, e.g., knowledge and <br /> experience with 4j, City of Eugene, local <br /> construction pracitices and local design <br /> considerations, local codes, CAD capability, <br /> ability to attend meetings on short notice, <br /> ability to work on flexible or accelerated <br /> schedules, professional project ��- <br /> management. <br /> Athletic and Recreational Facilities List comparable projects performed by firms <br /> comprising team. State which firm did work <br /> and who within firm were major designers. <br /> Owner, current phone, construction cost, <br /> completion date, contractors. Experience d <br /> working with synthetic athletic field surface, <br /> sports lighting, outdoor bleacher systems, ,; <br /> outdoor PA systems, new athletic fields, <br /> refurbishing of athletic fields, outdoor <br /> basketball and tennis, skateboard parks, etc n <br /> 15 16 <br /> References 10 7 <br /> Local Preference Both teams quality 10 <br /> General Firm Approach General firm approach. General philosophy _, <br /> Fee Lowest fee = 15 points, other fees discounte € a ' 5 15 <br /> Team Efficiency and Viability Team Efficiency and Viability. Please state t <br /> TOTAL L4 76 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.