New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium. June - September 1999
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
4J Stadium. June - September 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 2:55:05 PM
Creation date
8/6/2014 2:51:56 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.1 <br /> Meeting Agenda - SD Public Meetings <br /> Project: City of Eugene /4J <br /> Youth Sports Parks and Athletic Fields <br /> WBGS <br /> Date: September 14, 1999 <br /> Location: See below <br /> Time: See below <br /> ARCHITECTURE Prepared by: Curt Wilson <br /> & PLANNING, PC p y <br /> 1. Meeting Summary: <br /> 1.1. Schematic Design Review Meetings <br /> 9/21 Tu South Eugene HS 7:00 — 9:00 p SEHS Cafeteria <br /> 9/22 W Sheldon HS 7:00 — 9:00 p SHS Cafeteria <br /> 9/23 Th Churchill HS 7:00 — 9:00 p CHS Cafeteria <br /> 9/27 M Cal Young MS 7:00 — 9:00 p CYMS Cafeteria <br /> 9/28 Tu North Eugene HS 7:00 — 9:00 p NEHS Cafeteria <br /> 1.2. Development Design Review <br /> 10/18 M South Eugene HS 7:00 — 9:00 p SEHS Cafeteria <br /> 10/19 Tu North EugeneHS 7:00 — 9:00 p SHS Cafeteria <br /> 10/20 W Churchill HS 7:00 — 9:00 p CHS Cafeteria <br /> 10/25 M Cal Young MS 7:00 — 9:00 p CYMS Cafeteria <br /> 10/26 Tu Sheldon HS 7:00 — 9:00 p SHS Cafeteria <br /> 2. Presentation Material <br /> 2.1. Schematic designs for each site with new and renovated elements identified with <br /> color patterns. CMG will prepare and mount on boards. <br /> 2.2. Alternate layout of the Sheldon HS site with field oriented East -West. CMG will <br /> prepare and mount on boards. <br /> 2.3. 8'/2" x 11" copies of the schematic plan for distribution. Copies will be black and <br /> white. CMG will prepare. <br /> PRINCIPALS: <br /> 2.4. Aerial site photos of each site showing existing conditions. New elements are not <br /> RICHARD P. BRYANT, AIA overlayed on these photos. The photos are a few years old (i.e. Fire Station 6 does <br /> ERIC L. GUNDERSON, AIA not appear at the Sheldon HS site). WBGS will prepare and mount on boards. <br /> WILLIAM D. SEIDER, AIA 2.5. Skatepark boards for the Cal Young and Churchill sites. CMG has boards and will <br /> bring to meeting. <br /> ASSOCIATES: <br /> CURTIS WILSON, AIA <br /> HARRIET R. CHERRY, AIA <br /> 72 WEST BROADWAY <br /> EUGENE, OREGON 97401 <br /> PHONE 541- 342 -7291 <br /> FAX 541. 342.1535 Filename: pubmtgag.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.