New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Carver, Ridgeline Trail
COE
>
PW
>
POS_PWM
>
Parks
>
POS Director
>
Carver, Ridgeline Trail
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 1:42:14 PM
Creation date
8/6/2014 1:41:18 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Document_Number
Carver, Ridgeline Trail
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
050531 <br /> CARVER <br /> DEVELOPMENT - ry <br /> ffw <br /> October 18, 2004 � <br /> Mr. Johnny R. Medlin, Director <br /> Ms. Andrea G. Riner, Planning Manager <br /> Parks and Open Space Division <br /> Public Works <br /> CITY OF EUGENE <br /> 1820 Roosevelt Blvd. <br /> Eugene, OR 97402 <br /> Re: Proposed Ridgewood Drive Improvements <br /> Dear Mr. Medlin and Ms. Riner: <br /> Thank you very much for your time to meet on October 6, 2004. <br /> In accordance with your input, we propose the following cost share allocation: <br /> 1. The Parks and Open Space Division (POSD) will pay for all costs of <br /> improvement to the east half of the public portion of Ridgewood Drive abutting <br /> the POSD's property. Such improvements will be made pursuant to the plans <br /> prepared by Poage Engineering and previously delivered to the POSD. However, <br /> the POSD will not pay for any of the cost of the new asphalt paving. All of the <br /> cost of the new asphalt paving will be paid by us. <br /> 2. The POSD will pay for the costs of improvements to the east half of the private <br /> portion of Ridgewood Drive abutting the POSD's property. Such improvements <br /> will be made pursuant to the plans prepared by Poage Engineering and previously <br /> delivered to the POSD. However, the POSD will not pay for the cost of any of the <br /> new asphalt paving. All of the cost of the new asphalt paving will be paid by us. <br /> 3. We will solicit bids from at least three qualified contractors to do the work and <br /> will award the work to the lowest responsible bidder. Copies of all bids will be <br /> delivered to the POSD. <br /> 4. The costs of the improvements will also include but_not be limited to the costs of <br /> design, permits, road topography, surveys and inspections. The parties will <br /> equally share all such costs. <br /> 5. After the graveled road portion has been installed, we will submit one bill to <br /> POSD with supporting documentation for the POSD's share of the costs as <br /> outlined above. The POSD agrees to pay such bill within thirty days after receipt. <br /> PO Box 51505, Eugene, OR 97405 <br /> (541) 687-5922 • (541) 687-6513 Fax <br /> rcarveriii@aol.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.