New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Carver, Ridgeline Trail
COE
>
PW
>
POS_PWM
>
Parks
>
POS Director
>
Carver, Ridgeline Trail
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 1:42:14 PM
Creation date
8/6/2014 1:41:18 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Document_Number
Carver, Ridgeline Trail
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. , 4 k. 1..........--- <br /> , , . <br /> aiiii b _ 05 ®0531 <br /> -- l'irc.=. <br /> M u i� <br /> Y.` L ri . <br /> — ..'''', ::, ' '7 L,c, , .,,,, ., , <br /> L <br /> V <br /> .' <br /> a Q w > N <br /> - - silo) w m nents <br /> c -0 ow o0 fm 0. <br /> _cm o y + <br /> 1. R i = E- co = I..! <br /> Cl. a 0 1- w I Beet on October 6, 2004. <br /> yY't <br /> ■se the following cost share allocation: <br /> t np(uPb°1iSc D) w Pa for all costs o f port o Ridgewood D rive abutt <br /> lrovements wi be made p <br /> and previously delivered to the ursuant POSD to the 1Hplans oo theer, <br /> If the cost of the new asphalt paving <br /> aill be paid by us. <br /> s of improvements to the east half of the pements <br /> tatting the POSD's property. Such i p <br /> ans prepared by Poage Engineering and previously <br /> er, the POSD will not pay for the cost of any of the <br /> T W' o ° 3 St of the new asphalt paving will be paid by us. <br /> E x o st three qualified contractors to do the work and to <br /> C <br /> o y est responsible bidder. Copies of all bids will be <br /> W ; will also include but not be limited to the costs of <br /> hy, surveys and inspections. The parties will <br /> 5. After the graveled road portion has been installed, we will submit one bill to <br /> POSD with supporting documentation for the POSD's share of the costs as <br /> outlined above. The POSD agrees to pay such bill within thirty days after receipt. <br /> PO Box 51505, Eugene, OR 97405 <br /> (541) 687-5922 • (541) 687-6513 Fax ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.