Review Draft Eastern Gateway Wetland Restoration Site — Annual Report <br /> TABLE . SUMMARY EASTERN GATEWAY WETLAND PARTICIPATION <br /> (DECEMBER 1994) <br /> PARTICIPANT/ PROJECT LOCATION WETLAND MITIGATION MITIGATION <br /> IMPACT RATIO NEEDED <br /> (ACRES) (ACRES) <br /> City of Eugene, Public Works/FAA, .84 3:1 2.5 " <br /> Eugene Airport, runway extension <br /> Eugene Planning & Development DeptJHUD .4 3:1 1.2 <br /> Richardson Bridge Low Income Housing <br /> Project <br /> BPA, .25 3:1 .75 <br /> Substation improvement Goshen <br /> Ken Shiftlet, .25 2:1 .5 <br /> Private development, 950 Tyinn Street <br /> Total 1.74 4.95 <br /> Of the 7.29 acres of wetlands restored, 4.95 acres were accounted for by the <br /> original participants of the bank, and 2.34 acres of credit remain to be used, as <br /> of December 31, 1994. Please note that at the time of this writing, the <br /> remaining credits were being negotiated for purchase by ODOT. <br /> Survey and Calculation of Acreage <br /> Site Design <br /> In March of 1994 a City survey crew conducted a topographic survey of the site <br /> for the design team. The 1994 pre - project survey and the 1962 Lane County <br /> Construction Survey topographic maps were compared to one another by entering them into a <br /> computer assisted drawing (CAD) program. The resulting map estimated the <br /> approximate amount of fill on the site by subtracting the currently surveyed <br /> ground elevations from the 1962 surveyed ground elevations. The difference in <br /> height was the result of fill material bought to the site. Because the fill <br /> boundaries were easy to identify, a field map was created outlining the extent of <br /> the fill areas. The field map verified the contours created by the CAD system <br /> and provided a rough estimate of the acreage covered by fill material. <br /> The 1994 pre project survey and as-built surveys were used to calculate the <br /> actual number of acres of wetland restored as they were morg = accurate. Refer <br /> to Appendix for a copy of the computer printouts docufffelting acreage <br /> calculations. <br /> Project goals <br /> Mitigation efforts were concentrated on re- establishing the historic wetland types <br /> Page 4 <br />