New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Stormwater Erosion
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Stormwater Erosion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 4:04:38 PM
Creation date
7/9/2014 4:04:27 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Operations and Maintenance (OM) <br /> Eleven BMPs will be implemented in this category over the five -year permit period. During permit year one, <br /> tasks were completed in nine of the eleven BMPs. The goal of the OM category is to improve current <br /> operations and maintenance practices, and/or to adopt new policies and procedures to reduce the pollutants <br /> discharged to the system. <br /> Accomplishments during the first year include: <br /> • Completed the Regional Stormwater Waste Management Facility Feasibility Study which examined <br /> the issues and concerns associated with the management of stormwater system waste materials (see window). <br /> • Established a staff team to review Operations and Maintenance procedures. <br /> • Developed a draft Operations and Maintenance manual. <br /> • Staff trained on integrated pest management, turf management techniques to minimize surface runoff <br /> of pesticides and herbicides, and documented current fertilizer application activity by photograph. <br /> • Compiled research materials on environmentally - friendly de- icers, and training of staff on <br /> alternatives. <br /> • Bid and acquired Stormwater Maintenance Management Information System (Cassworks software). <br /> • Acquired hand -held Global Positioning System (GPS) to assist in data collection for storm channel <br /> node and outfall inventory in Cassworks. <br /> • Developed and implemented procedures to investigate, respond, and track property owner's informal <br /> appeals to stormwater user fees. <br /> • Developed an on -call team trained to respond to spills of environmentally harmful materials. <br /> During permit year two, a number of significant activities will be implemented in this category including: <br /> • An interdivisional review team will continue drafting an Operations and Maintenance manual. By <br /> the end of this permit year, the City plans to have a working draft manual. <br /> • The City will participate in the County's design of the Regional Stormwater Waste Management <br /> Facility. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.