New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Storm Sewer System
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Storm Sewer System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 3:10:14 PM
Creation date
7/9/2014 3:09:45 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The on -site systems would be a easy or as difficult to inspect/enforce as the program was set up <br /> to make them. If you assume most people would not live up to their maintenance responsibilities <br /> or were crooks, and you assume the compliance MUST be high, then the inspection/enforcement <br /> program will be costly and difficult. <br /> I personally think on -site inspection/enforcement can be made relatively easy if the majority of <br /> the burdenef- oof is placed on the occupant to show compliance, a monetary incemive is put <br /> into placed to encourage good maintenance, and the on -site design includes the maintenance <br /> instructions which will be required up -front when the facility is approved. <br /> 12. ACCEPTABLE TO RESOURCE/REGULATORYAGENCIES. <br /> 13. CONSISTENT w/LARGER PLANNING PROCESS <br /> 14. DEMONSTRATABLE PERFORMANCE. <br /> 15. LARGE ZONE OF BENEFITS. <br /> Sorry Tim, but it looks like this is as far as I'm going to be able to make it in the time allowed. <br /> Please give me a call (X -5255) if you have any questions. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.