New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Trees & Tree Commission
COE
>
PW
>
POS_PWM
>
Parks
>
Street Trees.Urban Forestry
>
Trees & Tree Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 2:24:44 PM
Creation date
7/9/2014 2:24:07 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lead Worker Park Spec. 3B 1 1 <br /> Aerial Lift Crew Ldr Park Spec. 3 1 2 <br /> Tree Trimmer Park Spec. 2B 2 2 <br /> Total 4 5 <br /> To utilize staff resources efficiently, it is important to have a Lead Worker/Inspector in <br /> addition to two full crews. Currently, the 3B is allotted only one day a week to conduct <br /> inspections and complete other administrative duties; i.e., purchasing, scheduling, etc. <br /> In order for the crew to function smoothly, more time should be allocated to these <br /> duties. The Leadworker will be available to backfill for crew absences but would be <br /> primarily engaged in coordinating activities. <br /> The section currently has two aerial lifts and two fully qualified operators capable of <br /> leading a two person crew. If each operator were made a crew leader (PS 3) and <br /> given a climbing qualified trimmer (PS 2B), the Section could fully utilize the equip- <br /> ment and allow the Leadworker to concentrate on inspections and scheduling. At <br /> present, with only four workers, any absence shuts down an entire crew. <br /> Because there is an existing backlog of requests, we are unable to initiate the new <br /> system without some phase -in. A sudden switch to the new system would mean engag- <br /> ing in almost 100% removal work (Class III) to the exclusion of maintenance pruning <br />
The URL can be used to link to this page
Your browser does not support the video tag.