New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
General Trees
COE
>
PW
>
POS_PWM
>
Parks
>
Street Trees.Urban Forestry
>
General Trees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 1:41:58 PM
Creation date
7/9/2014 1:41:30 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> j0 /o1/g6 09:43 ' 541 887 5572 EUGENE DEV DEPT 44-, CITY EUG PWMAINT <br /> e004/007 <br /> sufficiently to clear any impact on the Dee. It is also assumed a straight edge Along the west edge of the <br /> structure, similar to the rest of the project, will create a front along Lincoln that is consistent with the rest of <br /> the project. <br /> Project impact under this assumption: <br /> > Housing: The housing would be reduaad by one bay (approximately 36 feet), approximate loss to <br /> the project; four 1 bedroom units; four 2 bedroom units; and six studio units, total of 14 units <br /> (approximately 16% of the north complex). <br /> There are a number of possibilities as to how this area should be addressed and Long would probably want to <br /> spend several hours looking at options and redesign the west end of the complex. <br /> > Parking: The parking structure would be reduced one bay in length (approximately 27 feet). <br /> Approximate loss to the garage is 30 parking spaces (approximately 8% of the north complex). <br /> The ramp would need to be shifted one bay cast. Moving the ramp impacts the lobby area for the housing <br /> and garage. The lobby area would have to be moved east, which also impacts the housing design in that arca. <br /> This is a major change from one of the main design parameters the project was devdoped around, keeping the <br /> rhythm of the alley splitting the block. The north side's main entrance would no longer be directly across <br /> Broadway from thc south complex's main entrance. The necessary length of the ramp would not allow this. <br /> Moving the lobby would decrease the prime Broadway commercial area by approximately 27 feet. <br /> > Commercial: The commercial space adjacent to Lincoln and the west end of Broadway would be <br /> eliminated. The shift of the parking ramp and lobby would reduce the east portion by approximately <br /> 27 feet. Approximate loss to the project is 890 sq. ft. of prime commercial and 2550 sq. ft. of <br /> secondary commercial space. Total loss is 3440 sq. ft. (approximately 30% of the north complex). <br /> The commercial space remaining west of the lobby arca is small (1S -foot depth) and will be difficult to design <br /> and service and may be difScult to lease. <br /> > Lincoln Street frontage: Approximately 7,225 sq. ft. of limited use (approximately 13% of the <br /> site). <br /> In order to maintain the protection zone for the trees, the undeveloped setback space would be limited in its <br /> potential use for development that requires limited excavation. Possible uses could be surface parking or a <br /> pocket park There may be other options to develop the area not under the drip line. To provide parking, the <br /> design would be very tight given the new code guidelines and would require some excavation within thc drip <br /> line. There is a potential of approximately eight parking spaces. A pocket park would also require some <br /> excavation. A park would require additional maintenance and the irrigation could create problems for the <br /> underground portion of the garage. Since the park would be small and close to the downtown core, it is likely <br /> to become a "hang out ", which would be detrimental to renting the housing units. <br /> To accomplish the above; design changes would require several hundred hours of design labor and drafting to <br /> develop the new scheme and provide the construction documents for two different structures (combined total <br /> for all team members). As thc architectural/enginccring design development and construction document cost <br /> estimates were based on two, mirror -image structures, this will cause the situation that we will need to <br /> Page -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.