feel that much information can be gleaned from the old cetree system <br /> concerning tree names. Other issues to be resolved include tree numbering and <br /> the possibility of GDS mapping. Having these things in place will speed up <br /> the final training session. <br /> All of this leaves us in a position to begin the actual data collection <br /> for the tree inventory. We plan to start the inventory process in the month <br /> of March or April or as when the trees are leafed out. Our current plan is to <br /> hire a work study student(s), and divide the city into areas to gather the <br /> inventory. It is felt that it will require between 3 to 5 years to inventory <br /> Eugene's street trees. <br />