New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
School District (2)
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
School District (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 10:51:21 AM
Creation date
6/5/2014 11:32:19 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
August 1, 1995
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
One of the benefits of the Barger site is that the site can be designed to jointly meet the need for both a <br /> school and community park. The Parks and Open Space Acquisition Study, recently reviewed by the <br /> City Council, recognized this area as the location of a future community park. By developing the site <br /> for joint use, rather than having the District and City acquire separate sites, the overall acreage needed <br /> is reduced by 20 to 30 acres. In addition, land in west Eugene is rapidly being acquired by developers <br /> in anticipation of urban services becoming available. Once those services are available, vacant land in <br /> this area is expected to disappear and the opportunity for reserving land for a community park may be <br /> lost or at least would come at a significantly higher price. <br /> Status Report <br /> Site Acquisition -- The appraisal for the property was completed earlier this month. Negotiations to <br /> acquire a total of approximately 70 acres will occur this fall. City participation in the acquisition of the <br /> joint school /park is proposed. The City's share of the acquisition is expected to be between $500,000 <br /> and $700,000. This money could be borrowed against future Parks Systems Development revenues. <br /> Significant parks SDC's are anticipated in the coming years based on the amount of residential <br /> development underway and planned for the near future throughout the City. <br /> Provision of services to the site -- A new sanitary sewer pump station and pressure line are needed to <br /> serve this area. These projects are included in the CIP and are non - assessable parts of the sanitary <br /> sewer system. That is, whether the school located in this area or not, this system would be constructed <br /> by the City and paid for by SDC's. This system is planned for construction in 1997 and 1998 and will <br /> provide the necessary infrastructure to serve the school as well as future residential development <br /> planned for this area. <br /> Improvement of Barger Drive and extension of a new north/south street will be needed to serve the <br /> new school /park site. Portions of both of these projects will be assessable. At the request of the <br /> School District, the County Commissioners identified $500,000 in the County CIP for road <br /> improvements related to the new Bethel school. <br /> Site Design -- City staff from parks planning, engineering, transportation and planning are coordinating <br /> with the School District and the District's architect to prepare site plans. Efforts are being made to <br /> design the site to maximize shared use of facilities such as playgrounds, athletic fields, gymnasiums, <br /> and parking. Since the design of the school and park site is at the fore front of development in this <br /> area, overall streets patterns will be designed to facilitate bus, pedestrian and bike access to the site. <br /> The site, adjacent streets, and internal circulation patterns are also being designed to provide for site <br /> visibility, separation between middle school and elementary school students, and overall safety and <br /> security of the site. <br /> If you would like additional information or have any questions please contact me at 687 -5508. <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.