New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Public Works Day
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
Public Works Day
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2014 1:19:33 PM
Creation date
5/30/2014 9:14:38 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Document_Number
2007+ Public Works Day
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 -yard truck with sander setting on it, large crack sealer, asphalt roller, <br />paver, one backhoe, (Ritter contact). Tymco Sweeper, Elgin Sweeper, (Jobanek <br />contact). White 10 yard truck with a snow plow setting in front of it, large <br />concrete saw, (Colley contact). Tree truck w /chipper, stump grinder (Bonner <br />contact). One sewer Jet and one Combination Machine (if available), (Gibson <br />contact). Digger Derrick, Aerial truck, Street light Maintenance vehicle <br />(Randal Dale contact). Thermo Plastic Machine, Paint truck, Sign truck, <br />small paint striper, (Dick Stevens contact). Vibratory plow, ditch witch <br />trencher, Toro 580 D, HR -15 w /Flail, 4610 Low Rider (Dick Morgan for contact <br />as to which crew these units are assigned to). WWTP vehicles to be displayed <br />in a different area this year which will be near the building #10, #11 en- <br />trance. (Mike Boss would know who to coordinate with. In fact I would give <br />this whole project to Mike Boss and let him draft up a scheme as to the park- <br />ing plan. The parking line could run the full length of building #4 and #6, <br />probably three vehicles wide. If we have to reduce the equipment display <br />line by a few items we can jointly decide what that should be. <br />Fleet staff will move the equipment repair line Tuesday night and arrange for <br />staffing all events within their respective areas as will Maintenance Plan- <br />ning assist with tours and arrange for staffing any displays which they will <br />be involved with. <br />NOTE: Dave Ritter and Dave Colley provided a detailed work schedule which <br />identifies who will be here at specific times and what jobs they will have <br />those folks doing. I would appreciate a similar schedule from John Gibson <br />and Tony Jobanek, and have provided a sample so each of you can follow the <br />same format. <br />
The URL can be used to link to this page
Your browser does not support the video tag.