New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Implementation Analysis Proposal
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
Implementation Analysis Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 9:42:33 AM
Creation date
5/29/2014 9:19:08 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
October 19, 2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROGRAMS INCLUDED IN THE POS DIVISION <br />The Parks and Open Space Division is to have responsibility for four major program areas with staffing <br />organized consistent with those program areas. Three of the four sections will be created by transferring <br />in total the existing Parks Maintenance, Parks Planning, and Urban Forestry work units from the <br />Maintenance Division. The fourth section is to be a newly created work unit titled "Wetlands and Open <br />Waterways ". The new section would consists of a new position and staff transferred from both the <br />Maintenance and Engineering Divisions. <br />Parks & Open Space Division <br />Parks Planning I Weflands & Open Waterways I Parks Maintenance I I Han Forestry <br />The following organizational charts illustrate the distribution of personnel by name and classification to <br />match the accompanying program distribution charts . It should be noted that all of the positions shown <br />with the exception of the Division Manager, Administrative Aide 3, and Wetlands and Open Waterways <br />Manager positions are existing budgeted PWM or PWE positions. In most cases the incumbent is <br />shown with their existing classification or working title. <br />New funding is necessary for the Division Manager and Administrative Aide to be split on a percentage <br />basis from the General, Road, and Storm Sewer Funds. New funding for the Wetlands and Open <br />Waterways Manager would be from the Storm Sewer Fund. <br />October 19, 2000 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.