New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4584 PBS Postbid
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4584 PBS Postbid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2012 4:10:44 PM
Creation date
6/16/2010 4:19:50 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004584
GL_Project_Number
995364
Retention_Destruction_Date
2/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT BUDGET SUMMARY <br />PBM West 18th Ave 510' East of Chambers to Citv View <br />JN 4584 <br />ORIGINAL <br />(circle one) PRE-DESIGN <br />. <br />REVISED <br />CURRENT FUNDING STATUS <br /> <br />1! <br />PRE-BID <br />POST BID <br />FINAL <br />Original Budget allocated to this project - - - - - - - - <br />- - - - - - - <br />$2,637.50 <br />ACCOUNT FUND <br />Assessments <br />$0 00 <br />Road <br />$0 00 <br />Sanitary Sew. <br />$0 00 <br />Storm Sew. <br />$0 00 <br />Subsidy <br />$0 00 <br />975014 Fund 133 <br />$10,000 00 Note: $10,000 original budget from PPP with $2,637.50 actually spent before becoming PBM <br />Other <br />$0 00 <br />Other <br />$0 00 <br />ESTIMATED CONSTRUCTION COSTS <br />Contractor(s): Knife River Corporation-Northwest <br />Contract Amount - - - - - - - - - - - - - - - - - $997,997.97 <br />Contingency 15 0e $149,699.70 <br />Total Estimated Costs - - - - - - - - - - - - - - - $1,147,697.67 <br />ESTIMATED ENGINEERING COSTS <br />Engineering Expenses to Date (PSF) - - - - - - - - - - - - - $164,000 00 <br />Estimated Engineering Expenses to Completion- - - - - - - - - - $136,000 00 <br />Total Estimated Engineering Costs - - - - - - - - - - - - - - - - $300,000.00 <br />ESTIMATED ADMINISTRATION/SHORT TERM FINANCING <br />(use numbers from your assessment spreadsheet) <br />Admin. (50/o of assessable) - - - - - - - <br />- - - - <br />- - - - - <br />$0 00 <br />Short Term Construction Financing - - - - - <br />- <br />$0 00 <br />Total Estimated Admin/Construction Financing- - - <br />- - - - <br />- - - - - <br />$0.00 <br />ESTIMATED DIRECT COSTS <br />BOLT PW Fee- - - - - - - - - - - <br />- - - - <br />- - - - - <br />0 1% $998 00 <br />l ~n <br />Testing Expense Allocation - - - - - - - <br />- - - - <br />- - - - - <br />35 $29, 939 94 <br /> <br />/ <br />Warranty Inspection Fee - - - (Fund Number <br />to charge to: 3 <br />43 Street bona ) <br />$1,500 00 <br />tdiiuc an cen,ar°ropaown nsq <br />Permit Fees- - - - - - - - - - - - <br />- - - <br />- - - - - - <br />$0 00 <br />Printing - - - - - - - - - - - - <br />- - - - <br />- - - - - <br />$250 00 <br />Advertising - - - - - - - - - - - - <br />- - - - <br />- - - <br />$500 00 <br />Total Estimated Direct Costs - - - - - <br />- - - - <br />- - - - <br />$33,187.94 <br />ESTIMATED TOTAL EXPENSES <br />Estimated Contract Cost - - - - - - - <br />- - - - <br />- - - - - <br />- $1,147,697.67 <br />- Estimated Engineering Costs - - - - - - <br />- - - - <br />- - - - - <br />$300,000.00 <br />Estimated Admin/Financ./Direct Costs - - - - - <br />- - - - <br />- - - - - <br />- - - $33,187.94 <br />Total Estimated Project Costs - - - - - - <br />- - - - <br />- - - - - - <br />- $1,480,885.60 <br />REVISED FUNDING STATUS 4, i QJ ' <br />FUNDS TO <br />REMAINING <br />Short Term <br />THIS <br />FUND <br />`~f (FIUNDIING ISOUROE W01 y( Construct. Engineer. <br />°'t 343 Street Bond / \ $979,349.67 $292,027.50 <br />Direct <br />$33,187.94 <br />Finance <br />$0.00 <br />5°hAdm. <br />P <br />ROJECT <br />tr $1. 394H66.10 <br />t ~~w, ~ oo <br />985026 531 Stormwater Utility$40,037.00 $0.00 <br />$0.00 <br />$0.00 <br />~ <br />~ <br />10, 3.7. <br />~te <br />U 37 $o 0o Q, <br />985015 532 Wastewater Utility $2,275.00 $0.00 <br />975124 333 Trans <br />ortation SDC $126 <br />036 <br />00 $5 <br />335 <br />00 <br />$0.00 <br />$0 <br />00 <br />$0.00 <br />$0 <br />00 <br />S. fit' '$6:'60 <br />$131 <br />371 <br />00 <br />~ <br />a, 475 peso 00 [il q~ <br />, <br />p <br />. <br />, <br />. <br />975014 342 Pavement P <br />reservation $0.00 $2,637.50 <br />. <br />$0.00 <br />. <br />$0.00 <br />, <br />. <br />$2,637.50 <br />$o 00 <br />~i <br />t'9t 3ilt <br />$0 00 <br />Other. Overwrite cell to enter fund and fund number $0 00 $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Other. Overwrite cell to enter fund and fund number $0 00 $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />TOTAL $1,147,697.67 $300,000.00 <br />$33,187.94 <br />$0.00 <br />$0.00 $1,438,573.60 <br />$0.00 <br />$1,480,885.60 <br />BUDGET RECOMMENDATION <br />This is a Bond measure funded project that citizens voted to have constructed. I recommend moving forward and funding the construction. <br />end that funding for this project be allocated as shown above <br />6 <br />Prefect Ma age Date Pri cipal Enginee Date <br />Administration Date Ci Engineer Date <br />1478248.103 <br />6/15/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.