New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4546 Babb 2009-00030 CO#10
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4546 Babb 2009-00030 CO#10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 4:10:04 PM
Creation date
6/4/2010 12:34:21 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004546
GL_Project_Number
985374
COE_Contract_Number
2009-00030
Retention_Destruction_Date
6/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: Babb Construction Co. dba Delta Construction Co. <br />(ADDRESS) 999 Division Avenue <br />Eugene OR 97404 <br />PROJECT: Crest Nei ghborhood Street Improvement Proiect <br />You are directed to make the following changes in this contract: <br />Contract <br />Item <br />No. <br />Job # <br />4546 <br />Contract # <br />2009 -030 <br />Change Order# <br />10 <br />Date: <br />05/31/10 <br />CAMS Date: <br />$0.00 <br />Reviewed by: <br />Date: <br />Inspector: <br />T. Fahsbender /J. Pinkham <br />Proj. Mgr. <br />J. Willer d <br />Principal Eng. <br />P. Kla e 6 <br />783 Re - Excavate STA 18 +20 - +90 (Right on Storey Blvd as directed in the field Force Account 4/16/2010 <br />784 Re- Excavate STA 11 +00 (Right) on Store Blvd as directed in the field Force Account 4/22/2010 <br />812 Install tem ora storm pipe STA 19 +20 - 20 +32 Left Storey Blvd as directed in the field Force Account 4/22/2010 <br />813 Install 4" perf pipe with rock and filter fabric near 19 +00 §12rey Blvd as directed in the field Force Account 4116/2012 <br />901 Install area drain near 14 +60 Storey Blvd as directed in the field Force Account 5118/2010 and 5/21/2010 <br />A Two additional days will be added to the Contract Completion Dates for this Contract as a result of this Change Order. Also 2 additional days due to weather that <br />could not be predicted - in April and 4 days due to weather that could not be predicted in May will be added to the Contract Completion Time. The Stage to be <br />comp leted in 2010 except plantings and establishment pe6od, shall be complete by October 13 2010. There is no change to the planting completion date of <br />October 20 2010. <br />This changes the bid items as follows: <br />Contract <br />Item <br />No. Item <br />783 Re- Excavate STA 18 +20 -18 +90 (Right) on <br />Storey Blvd on 4/16/2010 <br />, <br />784 Re- Excavate STA 11 +00 (Right) on Storey Blvd <br />on 4/22/2010 <br />812 Install temporary storm pipe STA 19 +20 - 20 +32 <br />( Right) Sto= Blvd on 4/22/2010 <br />813 Install 4" pert pipe with rock and filter fabric near <br />19 +00 Storey Blvd on 4/16/2010 <br />901 Install area drain near 14 +50 Storey Blvd <br />on 5/18/2010 and 5/21/2010 <br />Amended <br />Net <br />Change <br />Change <br />The contract time change this C.O 0.0 day <br />$0.50 <br />$2,841..47 <br />The contract time change by previous C.O.'s 0.0 days <br />$0.00 <br />$0.00 <br />$258.66 <br />1.00 LS <br />0.00 <br />$2,841.47 <br />$0.00 <br />$0.00 <br />$747.70 <br />previous change order <br />Net change due to amendment by previous change order...._... � ......................................................................................................... .- ............................. <br />$o.Do <br />$0.00 <br />2,200.09 <br />This change order will change contract sum by this amount ." .... ............................... <br />$21 904.63 <br />$0.00 <br />$4,201.53 <br />Th new contract amendment sum .. ............................................................................................. ............................... <br />oD <br />$0.00 <br />D CONTRACTOR 11 OFFICE FILE ❑ PURCHASINGlCRO <br />Contract <br />Time <br />Chance <br />Original <br />Quantity <br />(Units) <br />0.00 <br />Unit <br />Cost <br />$0.00 <br />The original contract work days are 0.0 days <br />The contract time change this C.O 0.0 day <br />Revised <br />0.00 <br />The contract time change by previous C.O.'s 0.0 days <br />$0.00 <br />The new contract work da s are 0.0 days <br />1.00 LS <br />0.00 <br />$2,841.47 <br />$0.00 <br />The original contract sum was ............. ...............................-.-..................................................................................... ...........�.....,............. <br />Netchange by <br />$2,12 0 14 07.20 <br />previous change order <br />Net change due to amendment by previous change order...._... � ......................................................................................................... .- ............................. <br />$o.Do <br />T he contract sum prior to this change order was <br />$44 ,497.43 <br />This change order will change contract sum by this amount ." .... ............................... <br />$21 904.63 <br />....... ........................................................................................ ............................... <br />Th new contract net change sum <br />$1 D „�Z49.45 <br />$D <br />Th new contract amendment sum .. ............................................................................................. ............................... <br />oD <br />The new contract sum including this change order will�be <br />$54,746.88 <br />.................................................................. ................- .............. <br />P ercentage of original contract " " " " " " " " " " " " "" <br />$2 175 154.08 <br />NET CHANGE DUE TO AMENDMENTS ................................................................................................................... ............................... ..� <br />2 sa��o <br />2.58% <br />Approval by: <br />$747.70 <br />$0.00 <br />.�° Vf <br />City Engineer Prime Contractor Third Party <br />Revised <br />0.00 <br />$0.00 <br />0.00 <br />Date Date Date <br />Amended <br />Original <br />D CONTRACTOR 11 OFFICE FILE ❑ PURCHASINGlCRO <br />Contract <br />Time <br />Chance <br />Original <br />Quantity <br />(Units) <br />0.00 <br />Unit <br />Cost <br />$0.00 <br />Amount <br />$0.00 <br />Revised <br />0.00 <br />$0.00 <br />$0.00 <br />Amended <br />Original <br />1.00 LS <br />0.00 <br />$2,841.47 <br />$0.00 <br />$2,841.47 <br />$0.00 <br />Revised <br />0. 00 <br />0.00 <br />0.00 <br />Amended <br />Ori inai <br />1.00 LS <br />0.00 <br />$258.66 <br />10.00 <br />$258.66 <br />$0.00 <br />Revised <br />0.00 <br />$0.00 <br />$0.00 <br />Amended <br />Original <br />1.00 LS <br />0.00 <br />$747.70 <br />$0.00 <br />$747.70 <br />$0.00 <br />Revised <br />0.00 <br />$0.00 <br />0.00 <br />Amended <br />Original <br />1.00 LS <br />0.00 <br />$2,200.09 <br />10.00 <br />$2,200.09 <br />$0.00 <br />Revised <br />0.00 <br />$0.00 <br />0.00 <br />Amended <br />OrI inai <br />1.00 LS <br />0.00 <br />$4,201.53 <br />10.00 <br />$4,201,53 <br />$0.00 <br />Revised <br />0.00 <br />$ <br />$ 0.00 <br />Amended <br />0.00 <br />$0.00 <br />$0.00 <br />iicesrv 6145461Construction\Change Ordersl4546 Change Order 10.xlsx <br />