New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-94-18 (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-94-18 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:58:36 AM
Creation date
6/3/2009 11:02:21 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Traffic Control
Document_Date
8/12/1994
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~- - __ ~. S~- y~-gig <br />ADMINISTRATIVE ORDER <br />of the . <br />Traffic Engineer of the City of Eugene <br />~ 1 TH AVENUE -INSTALLATION OF BIKE LANE AND THIRD TRAVEL LANE <br />The Traffic Engineer of the City of Eugene finds that: <br />~ . The Eugene Code, Section 5.040 provides that the City Manager (or designee) shall <br />exercise specific traffic duties by administrative action, 'including: the implementation of <br />ordinances, resolutions, and motions .of the council and his or her own orders by installing traffic <br />control devices; and establishing, maintaining, removing or altering all traffic control areas and <br />traffic control devices-, <br />2. The administrative action taken to provide. for a bike lane and a third auto lane on 1 1 th <br />Avenue, and the resulting removal of on-street parking and other ,necessary changes to traffic <br />controls, is based on consideration of, and compliance with, the criteria set forth in Eugene Code, <br />Section 5.055; - , <br />3. The Eugene Bikeways Masterpian designates that 1 1 th 'Avenue between Kincaid Street <br />and Chambers Street shall have anon-street bike lane. TransPlan and the Jefferson Area <br />Refinement Plan identify 1 1 th Avenue as having three westbound auto travel lanes from Hilyard <br />Street to Garfield Street; <br />'~ 4. The project is consistent with the City Council's transportation goal of promoting <br />alternative modes of transportation, and other adopted state .and local plans and laws; <br />5. The. City Council appointed a special subcommittee- (Council Subcommittee on 1994 <br />Bikeways Projects) in June of 1994,. to specifically examine mitigation of the effects of parking- <br />. removal in the Westside Neighborhood. The- City Council subsequently approved a set of <br />.recommendations for 1 1 th Avenue based on the subcommittee's final report, .which shall be <br />implemented concurrently with the bike lane; <br />6. The proposed street design requires on-street parking. be prohibited along both sides of <br />1 1 th Avenue between Charnelton Street and Jefferson Street. Along the north side of 1 1 th <br />Avenue between Lincoln Street and Lawrence Street, a new parking bay will be constructed to <br />mitigate the parking loss. On-street parking on Lawrence Street south of 11th Avenue will be <br />regulated to provide additional shit-term parking; <br />7. Providing a separate bicycle facility in.this corridor will provide safer conditions for <br />bicycle travel and other travel modes on 1 1 th Avenue. The final design is in conformance with <br />traffic engineering standards; and <br />8. The'City provided a notice to owners\occupants of the proposed bike lane project in <br />May of 1994, and received a .number of written and verbal comments from the affected parties, <br />primarily opposed to the loss of on-street parking. These concerns were responded to directly by <br />staff and/or through the work .of the council subcommittee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.