New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3502 Wildish Change Order 1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3502 Wildish Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:55:32 PM
Creation date
7/9/2008 10:49:09 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003502
GL_Project_Number
985014
Identification_Number
2004100501
COE_Contract_Number
2004-00020
Retention_Destruction_Date
10/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~TY OF EUGENE <br />EPD ARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: WILDISH CONSTRUCTION CO. <br />(ADDRESS) P 0 BOX 7428 <br />Eugene, OR 97401-0428 <br />PROJECT: -Paving, curbs, gutters, sidewalks, median, street lights, traffic signal, <br />street trees, wastewater, and storm water drainage on Garden Way from <br />Sisters View Ave. to Martin Luther King Jr. Blvd. north side of Martin Luther <br />King Jr. Bivd. from Marche Chase Drive to I-5 <br />You arei directed to make the following changes in this contract: <br />Contract!, <br />Job # 3502 <br />Contract # 2004-20 <br />Change Omer # 1 <br />Date: 07/20!04 <br />CAMS Date: <br />Reviewed b : Date: <br />Inspector: John Bonham <br /> Pai a Dickinson <br />Proj. Mgr. Steve Gallu <br />Principal Eng. Paul Klo e <br />Item <br />No. I <br />1060 lnc ease th de th of drivewa to 8" on three drivewa between stations 39+00 - 43+50 <br />i 070 Re of roe t ree drivewa between station 39+00 - 43+50 with #4 rebar <br />1080 Ins II misc811aneous blocks ties and wire for reinforoin drivewa between stations 39+00 - 43+50. <br />1090 Ti and set rebar in drivewa between station 39+00 - 43+50 <br />1100 in ase utter bar de th from standard 7" to 9" in de th between curb cuts each drivewa between station 39+00 - 43+50. <br />1110 PI a 'and finish extra PCC <br />1120 7. cu is rds of drivewa excavation same three drivewa <br />1130 re AC tween station 39+00 - 43+50 <br />1140 re redin for vaned a r ate structure <br /> <br />This ch~nges the bid items as follows: <br />Contrast Contract <br />Item ! <br />No. '; Item Time <br />Change Quantity <br />(Units) Unit <br />Cost <br />Amount <br />(+/.) Amended <br />Change Net <br />Change <br /> Ori anal 0.00 ~ 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />1060 In eAse Drivewa to 8" De 0 Amended 3,50 ICY $70.00 $245.00 $245.00 <br /> Ori final 0.00 ; 0.00 0.00 $0.00 <br /> Revised 0.00 ? 0.00 0.00 <br />1070 # R~bar - 20' Sticks 0 Amended 120.00 I Each $6.00 $720.00 $720.00 <br /> Ori final 0.00 I 0.00 0.00 $0.00 <br /> Revised 0.001 0.00 0.00 <br />1080 S misc. blocks & tie wire for Reinfor ent 0 Amended 1.00 ILS $100.00 $100.00 $100.00 <br /> Ori final 0.00 ~ 0.00 ' 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />1090 blocks 8<Tie Reber 0 Amended 24.00 IHR $55.00 $1320.00 $1320.00 <br /> ~, Ori final 0.00 ~ 0.00 0.00 $0.00 <br /> Revised 0.001 0.00 0.00 <br />1100 I rease Gutter Bar De to 9" 0 Amended 1.00 'CY $70.00 $70.00 $70.00 <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 ~ 0.00 0.00 <br />1110 PI ce Extrd PCC 0 Amended 4.00 'HR $55.00 $220.00 $220.00 <br /> Ori final 0.00 ~ 0.00 0.00 $0.00 <br /> ~ Revised 0.00 ; 0.00 0.00 <br />1120 7. CY of drivewa excavation 0 Amended 7.50 ICY $20.00 $150.00 $150.00 <br /> Ori final 0.00 ~ 0.00 0.00 $0.00 <br /> Revised 0.001 0.00 0.00 <br />1130 E>I.tra AC additional 2" 0 Amended 168.60 ~ $46.00 $7 755.60 $7 755.60 <br /> Ori final 0.00 ~ 0.00 0.00 $0,00 <br /> Revised 0.00 0.00 0.00 <br />1140 a radin for varied a re ate structure 0 Amended 1.00 ILS $1250.00 <br />$1250.00 <br />$1250.00 <br /> Ori anal 0.00 0.00 0.00 $0.00 <br /> ~ Revised 0.00 ; 0.00 0.00 <br /> 0 Amended 0.00 ~ $0.00 $0.00 $0.00 <br />o 'ginal contract work days are o.o da <br />ntract time change this C.O 0.0 da <br />The contract time change by previous C.O.'s o.o da <br />Then w contract work da s are o.0 da <br />The original contract sum was <br />Net change by previous change order <br />Net clparoge due to amendment by previous change orcler~~ <br />The nt~ract sum prior to this change order was <br />This ange order will change contract sum by this amount <br />Then w contract net change sum <br />The new contract amendment sum <br />T-~e new contract sum including this chance order will be <br />CONTRACTOR ~ OFFICE FILE <br />Prime <br />PURCHASING/CRO <br />$2,079,450.75 <br />$o.oo <br />$0.00 <br />$2,079,450.75 <br />$11,830.60 <br />$o.oo <br />$11,830.60 <br />$2,091,281.35 <br />0.57% <br />0.57% <br />Third Party <br />Date <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.