<br />-~i'TY OF EUGENE
<br />DEPARTMENT OF PUBLIC WORKS
<br />ENGINEERING DIVISION
<br />~C I an a Order
<br />Mt 9
<br />CO~JTRACTOR: WILDISH CONSTRUCTION CO.
<br />ADDRESS) P O BOX 7428
<br />Eugene OR 97401-0428
<br />I' PROJECT: Paving curbs gutters sidewalks median street lights, traffic signal,
<br />street trees wastewater and storm water drainage on Garden Way from
<br />Sisters View Ava to Martin Luther King Jr. Blvd. north side of Martin Luther
<br />King Jr Blvd from Marche Chase Drive to I-5
<br />You ark directed to make the following changes in this contract:
<br />Contrac~
<br />Job # 3502
<br />Contract # 2004-20
<br />Change Order # 1
<br />Date: 07/20/04
<br />CAMS Date:
<br />Reviewed b : Date:
<br />Inspector: John Bonham
<br /> Pai a Dickinson
<br />Proj. Mgr. Steve Gallu
<br />Principal Eng. Paul Klo e
<br />Item
<br />No.
<br />
<br />I
<br />1060 In re se the de th of drivewa to 8" on three drivewa between stations 39+00 - 43+50
<br />1070 R inf rce three drivewa s between station 39+00 - 43+50 with #4 rebar
<br />1080 In tai miscellaneous blocks ties and wire for reinforcin drivewa between stations 39+00 - 43+50.
<br />1090 Ti and set rebar in drivewa between station 39+00 - 43+50
<br />1100 In re se utter bar de th from standard 7" to 9" in de th between curb cuts each drivewa between station 39+DO - 43+50.
<br />1110 PI ce and finish extra PCC
<br />1120 7. c' bic ards of drivewa excavation same three drivewa
<br />1130 ra AC between station 39+00 - 43+50
<br />1140 ra radin for varied a re ate structure
<br />
<br />This ch
<br />Contr¢
<br />ItP^+
<br />'~ anges the bid items as follows:
<br />ct Contract
<br />Time Quantity Unit Amended Net
<br />item Change (Units) Cost Amount (+/-) Change Change
<br /> Ori final 0.00 0.00 0.00 $0.00
<br /> Revised 0.00 ~ 0.00 0.00
<br />1060 I crease Drlvewa s to 8" De th 0 Amended
<br />Ori final 3.50 I
<br />0.00 1 CY $70,00
<br />0.00 $245.00
<br />0.00 $245.00
<br />$0.00
<br /> Revised 0.00 0.00 0.00
<br />1070 #It Rebar • 20' Sticks 0 Amended
<br />Ori final 120.00
<br />0.00 Each $6.00
<br />0.00 $720.00
<br />0.00 $720.00
<br />$0.00
<br /> Revised 0.00 0,00 0.00
<br />1080 5 misc. blocks & tie wire for Reinfor ent 0 Amended 1.00 , LS $100.00 $100.00 $100.00
<br /> Ori final 0.00 0.00 `' 0.00 $0.00
<br /> Revised 0.00 0.00 0.00
<br />1090 S blocks & Tie Rebar 0 Amended 24.00 HR $55.00 $1 320.00 $1 320.00
<br /> Ori final 0.00 0.00 0.00 $0.00
<br /> Revised 0.00 0.00 0.00
<br />1100 I 'crease Gutter Bar De th to 9" 0 Amended
<br />Ori Inal 1.00
<br />0.00 CY $70.00
<br />0.00 $70.00
<br />0.00 $70.00
<br />$0.00
<br /> ~ Revised 0.00 I 0.00 0.00
<br />1110 P ac6 Extra PCC 0 Amended
<br />Ori final 4.00
<br />0.00 HR $55.00
<br />0.00 $220.00
<br />0.00 $220.00
<br />$0.00
<br /> Revised 0.00 I 0.00 0.00
<br />1120 T5 CY of drivewa excavation 0 Amended
<br />Ori final 7.50
<br />0.00 CY
<br />~ $20.00
<br />0.00 $150.00
<br />0.00 $150.00
<br />$0.00
<br /> Revised 0.00 0.00 0.00
<br />1130 ra AC additional 2" 0 Amended
<br />Ori anal 168.60
<br />0.00 $46.00
<br />0.00 $7 755.60
<br />0.00 $7,755.60
<br />$0.00
<br /> Revised 0.00 0.00 0.00
<br />1140 a radin for varied a r ate structure 0 Amended
<br />Ori final 1.00
<br />0.00 ILS
<br />~ $1250.00
<br />0.00 $1 250.00
<br />0.00 $1 250.00
<br />$0.00
<br /> ~ Revised 0.00 0.00 0.00
<br /> 0 Amended 0.00 , $0.00 $0.00 $0.00
<br />riginal contract work days are o.o da s
<br />The contract time change this C.O o.o da s
<br />The contract time change by previous C.O.'s o.0 da
<br />The w contract work da s are o.o da
<br />The original contract sum was ................................................................................................................................................................................
<br />hange by previous change order ......................................................................................................................................................
<br />Mange due to amendment by previous change order ...............................................................................................................
<br />..............
<br />The ~ntract sum prior to this change order was ......................................................................................................................................................
<br />This hange order will change contract sum by this amount ............................................................................................................................
<br />The n w contract net change sum .............................................................................................................................
<br />The rt~ew contract amendment sum
<br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
<br />The rrew contract sum including this change order will be ,,,,,,,,,,,,,,,„...,..,,,,_,,,,,,,.,.,,,.,..,,.,,,,,,,,.,..........,.......................................................
<br />Percelntaae of original contract
<br />by:
<br />~7 ~/O ¢- /
<br />Datie
<br />K'.ONTRACTOR ~ OFFICE FILE
<br />$2,079,450.75
<br />$o.oo
<br />$0.00
<br />$2,079,450.75
<br />$11,830.80
<br />$o.oo
<br />$11,830.80
<br />$2,091,281.35
<br />0.57%
<br />r- 0.57Mo