~, <br />\\ <br />-~i'TY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />~C I an a Order <br />Mt 9 <br />CO~JTRACTOR: WILDISH CONSTRUCTION CO. <br />ADDRESS) P O BOX 7428 <br />Eugene OR 97401-0428 <br />I' PROJECT: Paving curbs gutters sidewalks median street lights, traffic signal, <br />street trees wastewater and storm water drainage on Garden Way from <br />Sisters View Ava to Martin Luther King Jr. Blvd. north side of Martin Luther <br />King Jr Blvd from Marche Chase Drive to I-5 <br />You ark directed to make the following changes in this contract: <br />Contrac~ <br />Job # 3502 <br />Contract # 2004-20 <br />Change Order # 1 <br />Date: 07/20/04 <br />CAMS Date: <br />Reviewed b : Date: <br />Inspector: John Bonham <br /> Pai a Dickinson <br />Proj. Mgr. Steve Gallu <br />Principal Eng. Paul Klo e <br />Item <br />No. <br /> <br />I <br />1060 In re se the de th of drivewa to 8" on three drivewa between stations 39+00 - 43+50 <br />1070 R inf rce three drivewa s between station 39+00 - 43+50 with #4 rebar <br />1080 In tai miscellaneous blocks ties and wire for reinforcin drivewa between stations 39+00 - 43+50. <br />1090 Ti and set rebar in drivewa between station 39+00 - 43+50 <br />1100 In re se utter bar de th from standard 7" to 9" in de th between curb cuts each drivewa between station 39+DO - 43+50. <br />1110 PI ce and finish extra PCC <br />1120 7. c' bic ards of drivewa excavation same three drivewa <br />1130 ra AC between station 39+00 - 43+50 <br />1140 ra radin for varied a re ate structure <br /> <br />This ch <br />Contr¢ <br />ItP^+ <br />'~ anges the bid items as follows: <br />ct Contract <br />Time Quantity Unit Amended Net <br />item Change (Units) Cost Amount (+/-) Change Change <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 ~ 0.00 0.00 <br />1060 I crease Drlvewa s to 8" De th 0 Amended <br />Ori final 3.50 I <br />0.00 1 CY $70,00 <br />0.00 $245.00 <br />0.00 $245.00 <br />$0.00 <br /> Revised 0.00 0.00 0.00 <br />1070 #It Rebar • 20' Sticks 0 Amended <br />Ori final 120.00 <br />0.00 Each $6.00 <br />0.00 $720.00 <br />0.00 $720.00 <br />$0.00 <br /> Revised 0.00 0,00 0.00 <br />1080 5 misc. blocks & tie wire for Reinfor ent 0 Amended 1.00 , LS $100.00 $100.00 $100.00 <br /> Ori final 0.00 0.00 `' 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />1090 S blocks & Tie Rebar 0 Amended 24.00 HR $55.00 $1 320.00 $1 320.00 <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />1100 I 'crease Gutter Bar De th to 9" 0 Amended <br />Ori Inal 1.00 <br />0.00 CY $70.00 <br />0.00 $70.00 <br />0.00 $70.00 <br />$0.00 <br /> ~ Revised 0.00 I 0.00 0.00 <br />1110 P ac6 Extra PCC 0 Amended <br />Ori final 4.00 <br />0.00 HR $55.00 <br />0.00 $220.00 <br />0.00 $220.00 <br />$0.00 <br /> Revised 0.00 I 0.00 0.00 <br />1120 T5 CY of drivewa excavation 0 Amended <br />Ori final 7.50 <br />0.00 CY <br />~ $20.00 <br />0.00 $150.00 <br />0.00 $150.00 <br />$0.00 <br /> Revised 0.00 0.00 0.00 <br />1130 ra AC additional 2" 0 Amended <br />Ori anal 168.60 <br />0.00 $46.00 <br />0.00 $7 755.60 <br />0.00 $7,755.60 <br />$0.00 <br /> Revised 0.00 0.00 0.00 <br />1140 a radin for varied a r ate structure 0 Amended <br />Ori final 1.00 <br />0.00 ILS <br />~ $1250.00 <br />0.00 $1 250.00 <br />0.00 $1 250.00 <br />$0.00 <br /> ~ Revised 0.00 0.00 0.00 <br /> 0 Amended 0.00 , $0.00 $0.00 $0.00 <br />riginal contract work days are o.o da s <br />The contract time change this C.O o.o da s <br />The contract time change by previous C.O.'s o.0 da <br />The w contract work da s are o.o da <br />The original contract sum was ................................................................................................................................................................................ <br />hange by previous change order ...................................................................................................................................................... <br />Mange due to amendment by previous change order ............................................................................................................... <br />.............. <br />The ~ntract sum prior to this change order was ...................................................................................................................................................... <br />This hange order will change contract sum by this amount ............................................................................................................................ <br />The n w contract net change sum ............................................................................................................................. <br />The rt~ew contract amendment sum <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />The rrew contract sum including this change order will be ,,,,,,,,,,,,,,,„...,..,,,,_,,,,,,,.,.,,,.,..,,.,,,,,,,,.,..........,....................................................... <br />Percelntaae of original contract <br />by: <br />~7 ~/O ¢- / <br />Datie <br />K'.ONTRACTOR ~ OFFICE FILE <br />$2,079,450.75 <br />$o.oo <br />$0.00 <br />$2,079,450.75 <br />$11,830.80 <br />$o.oo <br />$11,830.80 <br />$2,091,281.35 <br />0.57% <br />r- 0.57Mo <br />Third Party <br />Date <br />