thth <br /> <br />46 Ave, GJN 4832 - Move PBM funds to 18 Ave GJN 4809 and replace with 342 funds <br /> <br />th <br /> <br />Valley River Way. GJN 4842 - Move PBM funds to 18 Ave GJN 4809 and replace with 342 funds <br /> <br /> <br />Projects moved to 2015 to be funded by gas taxes (need PBM funding removed from the project): <br />th <br /> <br />Terry St, GJN 4835 - Move PBM funds to 18 Ave GJN 4809 and replace with 342 funds <br /> <br />th <br /> <br />Garden Way, GJN 4837 - Move PBM funds to 18 Ave GJN 4809 and replace with 342 funds <br /> <br />thth <br /> <br />8 Ave, GJN 4840 - Move PBM funds to 18 Ave GJN 4809 and replace with 342 funds <br /> <br /> <br />Willakenzie Rd, GJN 4836 - Move PBM funds to Broadway GJN 4841 and replace with 342 funds <br /> <br /> <br />Friendly St, GJN 4833 - Move PBM funds to Broadway GJN 4841 and replace with 342 funds <br /> <br /> <br />Projects moved to 2016 to be funded by gas taxes (need PBM funding removed from the project): <br /> <br />Donald St, GJN 4813 - Move PBM funds to Broadway GJN 4841 and replace with 342 funds <br /> <br /> <br />I think the 2011 Remonumentation work is complete (GJN 4742) and the left over funds can be moved to 2012 Planning <br />(GJN4735). <br /> <br />Let me know if you have any questions or need me to send you something else to move this project funding around. <br /> <br />Thanks, <br />Jenifer <br /> <br />Jenifer M. Willer, P.E. <br />Civil Engineer <br />City of Eugene <br />Public Works Engineering <br />99 East Broadway, Suite 400 <br />Eugene, OR 97401 <br />(541)682-5364 <br /> <br />2 <br />