New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
EWEB Resolution - street lights w 843 Procedure applicable to City of Eugene
COE
>
PW
>
POS_PWM
>
PWT
>
EWEB Resolution - street lights w 843 Procedure applicable to City of Eugene
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2012 10:11:17 AM
Creation date
3/30/2012 7:57:33 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Contracts
PW_Division
Maintenance
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Emergency Repair <br />(Includes, but is not limited to, clearance of energized street light <br />circuits from public right -of -way, including necessary disconnection of <br />City -owned equipment from EWEB system.) <br />1. A customer report regarding emergency repair of City -owned street <br />light equipment shall be referred to the EWEB Electric Operations <br />department (Operations) for disconnection of City equipment from the <br />EWEB system. <br />484 -2411 During regular business hours <br />484 -0777 All other times <br />2. Operations shall perform the necessary work to clear any damaged City <br />facilities from the street right -of -way and to disconnect City <br />facilities from the EWEB electrical system. All labor and equipment <br />will be charged to IR #9999 and a work order written specifically for <br />the work. <br />3. EWEB Operations shall notify the City maintenance department as soon <br />as possible. <br />687 -5231 During regular business hours <br />687 -5121 All other times <br />( 4. Operations shall notify the Electric Distribution Section (using <br />Maintenance form #53- 01800). Reconnection of the City equipment will <br />be coordinated by Distribution and charged to the work order issued <br />in Step 2. <br />5. Operations will submit the completed work order to the billing clerk <br />in Accounting. <br />6. Accounting will submit billing to the City of Eugene for the actual <br />job costs. <br />-23- <br />1L4nnr 07/01/83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.