Run Date: 12/08/2011 12:19:38 <br />City of Eugene <br />Page 3 <br />Contract Preliminary Progress Payment <br />Payment No : 005 <br />Contractor: KNIFE RIVER Original Contract: $1,049,104.90 <br />Job #: 93- 004681 Current Amount: $1,292,240.10 <br />Contract No: 2012 -00002 Contract Award Date: 07/20/2011 <br />PO #: 2012100049 Completion Date: 10/14/2011 <br />Assessable: No <br />Line <br />Description <br />Last Chng Ord <br />Unit Price <br />Unit Measure <br />Current Contract <br />Quantity <br />Amount <br />Estimated <br />Quantity <br />Payment <br />Amount <br />Cumulative <br />Quantity <br />Totals <br />Amount <br />% Complete <br />0202 <br />PLUG PIPES /GROUT PIPE OPENINGS <br />004 <br />$390.98 <br />LUMPSUM <br />1.000 <br />$390.98 <br />1.000 <br />$390.98 <br />1.000 <br />$390.98 <br />100.00 <br />0203 <br />WORK AROUND ABANDONED CATCH BA <br />006 <br />$157.98 <br />LUMPSUM <br />1.000 <br />$157.98 <br />1.000 <br />$157.98 <br />1.000 <br />$157.98 <br />100.00 <br />0204 <br />REPLACE SHALLOW STORM LINE N. <br />006 <br />$1,218.92 <br />LUMPSUM <br />1.000 <br />$1,218.92 <br />1.000 <br />$1,218.92 <br />1.000 <br />$1,218.92 <br />100.00 <br />0205 <br />REM /REPL SD PIPE CB 56959 TO M <br />007 <br />$1,602.31 <br />LUMPSUM <br />1.000 <br />$1,602.31 <br />1.000 <br />$1,602.31 <br />1.000 <br />$1,602.31 <br />100.00 <br />0206 <br />REM TOP FROM ABANDONED CB NW C <br />007 <br />$118.31 <br />LUMPSUM <br />1.000 <br />$118.31 <br />1.000 <br />$118.31 <br />1.000 <br />$118.31 <br />100.00 <br />0210 <br />ADJUSTING CATCH BASINS <br />005 <br />$725.00 <br />EACH <br />5.000 <br />$3,625.00 <br />0.000 <br />$0.00 <br />5.000 <br />$3,625.00 <br />100.00 <br />0220 <br />ADJUSTING BOXES <br />$300.00 <br />EACH <br />8.000 <br />$2,400.00 <br />0.000 <br />$0.00 <br />5.000 <br />$1,500.00 <br />63.00 <br />0230 <br />MINOR ADJUSTMENT OF MANHOLES <br />$1,050.00 <br />EACH <br />30.000 <br />$31,500.00 <br />0.000 <br />$0.00 <br />24.000 <br />$25,200.00 <br />80.00 <br />0240 <br />EXTRA ADJUST MH W /EXISTING CON <br />$200.00 <br />EACH <br />5.000 <br />$1,000.00 <br />0.000 <br />$0.00 <br />3.000 <br />$600.00 <br />60.00 <br />0250 <br />MH FRAME /COVER -ST <br />$325.00 <br />EACH <br />7.000 <br />$2,275.00 <br />1.000 <br />$325.00 <br />7.000 <br />$2,275.00 <br />100.00 <br />0251 <br />WASHINGTON S. SIDE - SHALLOW PIP <br />003 <br />$3,534.90 <br />LUMPSUM <br />1.000 <br />$3,534.90 <br />1.000 <br />$3,534.90 <br />1.000 <br />$3,534.90 <br />100.00 <br />0252 <br />REM /REPL PIPE WASHINGTON NORTH <br />003 <br />$570.50 <br />LUMPSUM <br />1.000 <br />$570.50 <br />1.000 <br />$570.50 <br />1.000 <br />$570.50 <br />100.00 <br />0253 <br />ABANDON 4 PIPE, LINCOLN ALLEY <br />004 <br />$80.23 <br />LUMPSUM <br />1.000 <br />$80.23 <br />1.000 <br />$80.23 <br />1.000 <br />$80.23 <br />100.00 <br />0254 <br />REM %REPL PIPE Q MH 56122 WILLA <br />004 <br />$1,451.38 <br />LUMPSUM <br />1.000. <br />$1,451.38 <br />1.000 <br />$1,451.38 <br />1.000 <br />$1,451.38 <br />100.00 <br />0260 <br />MH FRAME /COVER -WW <br />$325.00 <br />EACH <br />6.000 <br />$1,950.00 <br />3.000 <br />$975.00 <br />6.000 <br />$1,950.00 <br />100.00 <br />0261 <br />REM /REPL SEWER SERV FOR 555 E <br />006 <br />$2,082.72 <br />LUMPSUM <br />1.000 <br />$2,082.72 <br />1.000 <br />$2,082.72 <br />1.000 <br />$2,082.72 <br />100.00 <br />0262 <br />REPAIR WW LATERAL TO 1790 FERR <br />007 <br />$560.20 <br />LUMPSUM <br />1.000 <br />$560.20 <br />1.000 <br />$560.20 <br />1.000 <br />$560.20 <br />100.00 <br />0263 <br />REM /REPL 4 CLAY WW Q 423 E 18 <br />007 <br />$977.49 <br />LUMPSUM <br />1.000 <br />$977.49 <br />1.000 <br />$977.49 <br />1.000 <br />$977.49 <br />100.00 <br />0270 <br />COLD PLANE PVMT REMOVAL, TAPER <br />$0.32 <br />SQFT <br />36,124.000 <br />$11,559.68 <br />0.000 <br />$0.00 <br />40,023.800 <br />$12,807.62 <br />111.00 <br />0280 <br />COLD PLANE PVMT REMOVAL, 4 DE <br />$0.32 <br />SQFT <br />26,871.000 <br />$8,598.72 <br />0.000 <br />$0.00 <br />26,951.670 <br />$8,624.53 <br />100.00 <br />0290 <br />REMOVAL OF ASPHALT TO CONCRETE <br />$1.25 <br />SQFT <br />5,179.000 <br />$6,473.75 <br />0.000 <br />$0.00 <br />4,312.700 <br />$5,390.88 <br />83.00 <br />0300 <br />LEVEL 3, 1/2" DENSE WMAC <br />$54.35 <br />TON <br />5,200.000 <br />$282,620.00 <br />0.000 <br />$0.00 <br />5,623.670 <br />$305,646.46 M <br />108.00 <br />0310 <br />LEVEL 1, 1/2" DENSE WMAC <br />$51.35 <br />TON <br />2,000.000 <br />$102,700.00 <br />0.000 <br />$0.00 <br />2,201.400 <br />$113,041.89 <br />110.00 <br />0320 <br />ASPHALT CONCRETE PAVEMENT REPA <br />005 <br />$84.00 <br />CUYD <br />259.770 <br />$21,820.68 <br />0.000 <br />$0.00 <br />259.770 <br />$21,820.68 <br />100.00 <br />0321 <br />ADDITIONAL SAWCUTTING CENTER L <br />006 <br />$243.00 <br />LUMPSUM <br />1.000 <br />$243.00 <br />1.000 <br />$243.00 <br />1.000 <br />$243.00 <br />100.00 <br />0330 <br />CONCRETE PAVEMENT REPAIRS <br />005 <br />$88.00 <br />CUYD <br />34.330 <br />$3,021.04 <br />34.330 <br />$3,021.04 <br />34.330 <br />$3,021.04 <br />100.00 <br />