Run Date: 12/08/2011 12:19:38 <br />City of Eugene Page 2 <br />Contract Preliminary Progress Payment <br />Payment No : 005 <br />Contractor: KNIFE RIVER Original Contract: $1,049,104.90 <br />Job #: 93- 004681 Current Amount: $1,292,240.10 <br />Contract No: 2012 Contract Award Date: 07/20/2011 <br />PO #: 20121/ 00049 <br />Assessable: No Completion Date: 10/14/2011 <br />Line <br />Description <br />Last Chng Ord <br />Unit Price <br />Unit Measure <br />Current Contract <br />Quantity <br />Amount <br />Estimated <br />Quantity <br />Payment <br />Amount <br />Cumulative <br />Quantity <br />Totals <br />Amount <br />% Complete <br />PBM 18TH <br />AVE PATTERSON TO WASHINGTON <br />General <br />0000 <br />0010 <br />0020 <br />Liquidated Damages <br />MOBILIZATION <br />EROSION CONTROL <br />($700.00) <br />$80,664.20 <br />$5,000.00 <br />DAY <br />LUMPSUM <br />LUMPSUM <br />0.000 <br />1.000 <br />1.000 <br />$0.00 <br />$80,664.20 <br />$5,000.00 <br />0.000 <br />0.000 <br />0.000 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />0.000 <br />1.000 <br />0.950 <br />1.000 <br />0.000 <br />0.950 <br />0.950 <br />907.500 <br />302.000 <br />21.000 <br />2.000 <br />2,049.930 <br />278.400 <br />403.700 <br />1,320.100 <br />62.500 <br />$0.00 <br />$80,664.20 <br />$4,750.00 <br />$250.00 <br />$0.00 <br />$665.00 <br />$25,650.00 <br />$39,022.50 <br />$15,100.00 <br />$630.00 <br />$600.00 <br />$22,549.23 <br />$3,062.40 <br />$3,835.15 <br />$27,722.10 <br />$1,937.50 <br />0.00 <br />100.00 <br />95.00 <br />100.00 <br />0.00 <br />95.00 <br />95.00 <br />70.00 <br />126.00 <br />47.00 <br />50.00 <br />125.00 <br />82.00 <br />98.00 <br />112.00 <br />100.00 <br />0030 <br />0040 <br />0050 <br />CWM PLAN <br />CWM SUMMARY <br />CONCRETE WASH AREA <br />$250.00 <br />$250.00 <br />$700.00 <br />EACH <br />EACH <br />LUMPSUM <br />1.000 <br />1.000 <br />1.000 <br />$250.00 <br />$250.00 <br />$700.00 <br />0.000 <br />0.000 <br />0.000 <br />0060 <br />0070 <br />0080 <br />0090 <br />0100 <br />0110 <br />0120 <br />0130 <br />0140 <br />0150 <br />TEMP. WORK ZONE TRAFFIC CONTRO <br />FLAGGERS <br />PORTABLE CHANGEABLE MESSAGE SI <br />SEQUENTIAL ARROW SIGNS <br />CITY PROVIDED SPEC INFO SIGNS <br />PLAIN CONCRETE PVMT, DOWELED,1 <br />PLAIN CONCRETE PVMT(RED), UNDO <br />REINFORCED CONCRETE PVMT, 11 <br />CURB & GUTTER, REM /REPL <br />CONCRETE CURBS, REM /REPL <br />005 <br />$27,000.00 <br />$43.00 <br />$50.00 <br />$30.00 <br />$300.00 <br />$11.00 <br />$11.00 <br />$9.50 <br />$21.00 <br />$31.00 <br />LUMPSUM <br />HOUR <br />DAY <br />DAY <br />EACH <br />SQFT <br />SQFT <br />SQFT <br />LINFT <br />FOOT <br />1.000 <br />1,300.000 <br />240.000 <br />45.000 <br />4.000 <br />1,641.000 <br />341.000 <br />412.500 <br />1,181.000 <br />62.500 <br />$27,000.00 <br />$55,900.00 <br />$12,000.00 <br />$1,350.00 <br />$1,200.00 <br />$18,051.00 <br />$3,751.00 <br />$3,918.75 <br />$24,801.00 <br />$1,937.50 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0160 <br />0170 <br />1' WIDE CONCRETE RIBBON CURB, <br />CONCRETE WALKS <br />$24.00 <br />$7.50 <br />FOOT <br />SQFT <br />82.000 <br />2,967.000 <br />$1,968.00 <br />$22,252.50 <br />17.000 <br />0.000 <br />$408.00 <br />$0.00 <br />$0.00 <br />107.800 <br />3,208.940 <br />1.000 <br />$2,587.20 <br />$24,067.05 <br />$170.41 <br />131.00 <br />108.00 <br />100.00 <br />0171 <br />REINSTALL ROCK WALL SW OLIVE /1 <br />002 <br />$170.41 <br />LUMPSUM <br />1.000 <br />$170.41 <br />0.000 <br />0172 <br />0173 <br />INSTALL 3 PVC PIPE UNDER SIDE <br />RELAY PAVERS SW CORNER HIGH BE <br />002 <br />006 <br />$201.40 <br />$1,338.13 <br />LUMPSUM <br />LUMPSUM <br />1.000 <br />1.000 <br />$201.40 <br />$1,338.13 <br />0.000 <br />1.000 <br />$0.00 <br />$1,338.13 <br />1.000 <br />1.000 <br />$201.40 <br />$1,338.13 <br />100.00 <br />100.00 <br />0180 <br />CONCRETE DRIVEWAYS <br />005 <br />$13.00 <br />SQFT <br />193.300 <br />$2,512.90 <br />0.000 <br />$0.00 <br />193.300 <br />$2,512.90 <br />100.00 <br />0190 <br />TRUNCATED DOME DETECTABLE WARN <br />$17.00 <br />SQFT <br />206.000 <br />$3,502.00 <br />0.000 <br />$0.00 <br />216.000 <br />$3,672.00 <br />105.00 <br />0200 <br />CATCH BASIN, W /BIKE PROOF GRA <br />$1,700.00 <br />EACH <br />1.000 <br />$1,700.00 <br />0.000 <br />$0.00 <br />1.000 <br />$1,700.00 <br />100.00 <br />0201 <br />REM ADANDONED STM PIPE E. SIDE <br />004 <br />$302.18 <br />LUMPSUM <br />1.000 <br />$302.18 <br />1.000 <br />$302.18 <br />1.000 <br />$302.18 <br />100.00 <br />