If Contractor is delayed or additional work is required by reason of existing regulations or ordinances <br />not cited above, or due to the enactment of new or the amendment of existing statutes, ordinances or <br />regulations relating to the prevention of environmental pollution and the preservation of natural <br />resources occurring after submission of the successful bid, the Work may be terminated, suspended <br />or continued as provided for in the Oregon Public Contracting Code. <br />23. Effective Date. The effective date of the Contract shall be the latest date of signature by the parties. <br />CITY OF EUGENE <br />4\ By: Vt4'�' <br />,per (sign lure) <br />/ Kurt Corey, P.E Kurt Corey, P.E. <br />Public Works Director <br />Date: Z 'h <br />CONTRACTOR <br />kV� / <br />r <br />Kelly Wilder, President <br />SiteWork Construction, Inc. <br />Date: - 7 <br />Public Improvement Contract for Use with Oregon Standard Specifications — Page 7 <br />(Revised February 2004) <br />