Run Date: 09/08/2011 15:13:24 <br />Contractor: WILDISH CONSTRUCTION <br />Job #: 93- 004682 <br />Contract No: 2011 -00015 <br />PO #: 2011100427 <br />Assessable: No <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 003 <br />Original Contract: $1,533,794.50 <br />Current Amount: $1,533,794.50 <br />Contract Award Date: 06/03/2011 <br />Completion Date: 11/01/2011 <br />Current Contract <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity <br />Cumulative Totals <br />Amount Quantity <br />0250 <br />MH FRAME /COVER - WW <br />$350.00 <br />EACH <br />3.000 <br />$1,050.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0260 <br />10" STORM DRAIN PIPE <br />$50.00 <br />FT <br />163.000 <br />$8,150.00 <br />7.000 <br />$350.00 <br />85.70 -0 <br />$4,285.00 <br />53.00 <br />0270 <br />10" STORM DRAIN PIPE, C900 <br />$50.00 <br />FT <br />182.000 <br />$9,100.00 <br />70.000 <br />$3,500.00 <br />272.200 <br />$13,610.00 <br />150.00 <br />0280 <br />12" STORM DRAIN PIPE <br />$100.00 <br />FT <br />38.000 <br />$3,800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0290 <br />CONNECT TO EXST PIPE <br />$250.00 <br />EACH <br />9.000 <br />$2,250.00 <br />4.000 <br />$1,000.00 <br />13.000 <br />$3,250.00 <br />144.00 <br />0300, <br />CONNECTION TO EXISTING STRUCTU <br />$500.00 <br />EACH <br />10.000 <br />$5,000.00 <br />6.000 <br />$3,000.00 <br />11.000 <br />$5,500.00 <br />110.00 <br />0310 <br />INSTALL CONCRETE INLET, 4A <br />$1,500.00 <br />EACH <br />14.000 <br />$21,000.00 <br />3.000 <br />$4,500.00 <br />9.000 <br />$13,500.00 <br />64.00 <br />0320 <br />CONCRETE CB WITH BIKE PROOF GR <br />$1,200.00 <br />EACH <br />2.000 <br />$2,400.00 <br />1.000 <br />$1,200.00 <br />3.000 <br />$3,600.00 <br />150.00 <br />0330 <br />WATER QUALITY MANHOLE <br />$25,000.00 <br />EACH <br />1.000 <br />$25,,00.0.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0340 <br />8" PVC WASTEWATER PIPE <br />$130.00 <br />FT <br />41.000 <br />$5,330.00 <br />0.000 <br />$0.00 <br />39.000 <br />$5,070.00 <br />95.00 <br />0350 <br />ADJUSTING BOXES <br />$150.00 <br />EACH <br />38.000 <br />$5,700.00 <br />36.000 <br />$5,400.00 <br />46.000' <br />$6,900.00 <br />121.00 <br />0360 <br />Adjust Clean Out <br />$150.00 <br />EACH <br />4.000 <br />$600.00 <br />8.000 <br />$1,200.00 <br />8.000 <br />$1,200.00 <br />200.00 <br />0370 <br />LEVEL 3, 1/2" DENSE WMAC <br />$60.00 <br />TON <br />4,400.000 <br />$264,000.00 <br />771.590 <br />$46,295.40 <br />1,877.380 <br />$112,642.80 M <br />43.00 <br />0380 <br />LEVEL 1, 1/2" DENSE WMAC <br />$60.00 <br />TON <br />1,250.000 <br />$75,000.00 <br />282.240 <br />$16,934.40 <br />662.390 <br />$39,743.40 <br />53.00 <br />0390 <br />EXTRA FOR ASPHALT APPROACHES <br />$350.00 <br />EACH <br />3.000 <br />$1,050.00 <br />0.500 <br />$175.00 <br />1.000 <br />$350.00 <br />33.00 <br />0400 <br />PLAIN CONCRETE PAVEMENT, 9" TH <br />$6.00 <br />SQFT <br />2,408.000 <br />$14,448.00 <br />0.000 <br />$0.00 <br />2,606.000 <br />$15,636.00 <br />108.00 <br />0410 <br />PLAIN CONCRETE PAVEMENT 12" TH <br />$10.00 <br />SQFT <br />3,224.000 <br />$32,240.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0420 <br />CONCRETE CURB AND GUTTER <br />$11.00 <br />FOOT <br />5,880.000 <br />$64,680.00 <br />1,037.100 <br />$11,408.10 <br />3,003.000 <br />$33,033.00 <br />51.00 <br />0430 <br />CONCRETE CURB, VARIABLE HEIGHT <br />$20.00 <br />FT <br />460.000 <br />$9,200.00 <br />62.800 <br />$1,256.00 <br />95.800 <br />$1,916.00 <br />21.00 <br />0440 <br />CONCRETE CURB STANDARD <br />$40.00 <br />FT <br />32.000 <br />$1,280.00 <br />14.500 <br />$580.00 <br />50.500 <br />$2,020.00 <br />158.00 <br />0450 <br />CONCRETE VALLEY GUTTER <br />$25.00 <br />FT <br />800.000 <br />$20,000.00 <br />0.000 <br />$0.00 <br />738.500 <br />$18,462.50 <br />92.00 <br />0460 <br />4" CONC WALK <br />$6.00 <br />SQFT <br />12,710.000 <br />$76,260.00 <br />7,339.500 <br />$44,037.00 <br />9,330.700 <br />$55,984.20 <br />73.00 <br />0470 <br />7" CONCRETE DRIVEWAY <br />$10.00 <br />SQFT <br />4,652.000 <br />$46,520.00 <br />606.000 <br />$6,060.00 <br />1,538.300 <br />$15,383.00 <br />33.00 <br />0480 <br />TRUNCATED DOMES <br />$15.00 <br />SQFT <br />410.000 <br />$6,150.00 <br />90.000 <br />$1,350.00 <br />120.000 <br />$1,800.00 <br />29.00 <br />0490 <br />THERMOPLASTIC, NON - PROFILE, 90 <br />$12,000.00 <br />LUMPSUM <br />1.000 <br />$12,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0500 <br />YELLOW CURB PAINT <br />$2.00 <br />FT <br />103.000 <br />$206.00 <br />0.000. <br />$0 <br />0.000 <br />$0.00 <br />0.00 <br />Estimated Payment <br />Amount Quantity <br />Page 3 <br />Complete <br />Amount <br />