New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
EPA Letter and backup
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2011
>
EPA Letter and backup
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2011 1:36:28 PM
Creation date
8/18/2011 1:35:50 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2011
PW_Division
Engineering
GL_Fund
131
GL_ORG
9340
GL_Grant
621
GL_Project_Number
300316
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
building is appropriate. The City shall include in the determination the total contract price <br />and the amount the City intends to expend on the inclusion of solar energy technology in <br />the public building, utilizing the form developed by the State Department of Energy. This <br />provision applies to the reconstruction or major renovation of a public building if the cost <br />of the reconstruction or major renovation exceeds fifty percent (50%) of the value of the <br />public building. "Public building" shall have the meaning set out in ORS 279C.527. <br />Article 16 Contract Administration Page 89 <br />Exhibit A to Administrative Order No. 44-08-06-F <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.