<br /> <br />thth <br />News Release – Paving Repairs Under Way on Willamette Street from 29 to 46 Avenues <br />July 5, 2011 <br />Page 2 <br /> <br /> <br />Here’s a more detailed breakdown of the construction scheduling: <br />th <br /> <br /> Early July – Excavate the existing concrete surface on Willamette from 29 to Crest Drive <br />and rebuild the street using warm-mix asphalt. One lane open for southbound traffic; <br />rd <br />northbound traffic detoured at 33 Avenue to Hilyard Street. <br />th <br /> <br /> Late July – Reconstruct Willamette Street from Crest Drive to 40 Avenue using in-place <br />th <br />recycling. Northbound Willamette closed from at 46 Avenue (use Donald Street as a detour <br />thth <br /> <br /> Late August – Repave Willamette Street from 40 to 46 avenues with warm mix asphalt. <br />th <br />Northbound Willamette closed from 46 to Donald. <br /> <br /> Early September – Top lift paving, final lane striping and signal work. All work scheduled to <br />be completed by September 23, 2011. <br />Updates on this project and other road-repair projects in the metro area are available at <br />www.keepusmoving.info <br /> <br /># # # <br /> <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />