Report ID: LBILL001 <br />Lane County <br />BILLABLE PROJECT COSTS <br />Page No. 2 <br />Run Date 05/20/2011 <br />Run Time 14:57:28 <br />Billable Project Costs for Fiscal Period 2011 -04 Period begins 04/01/2011 and ends including 04/30/2011 <br />Project: 36644609 AC Mix Verifi Billable HOLD Overhead Rates Applied for this project: Operational (Where applicable) <br />04/06/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L2 & L3 AC <br />04/06/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />04/07/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />ASPHALT MIX DESIGN <br />04/07/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L2 & L3 AC <br />04/07/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />04/08/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />ASPHALT MIX DESIGN <br />04/08/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />WILDISH AND ESC ROCK PREP <br />04/08/2011 <br />LABOR <br />Sr Engineering Associate <br />3 <br />$91.02 <br />$148.65 <br />WILDISH DESIGNS <br />04/11/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />ESC ROCK PREP <br />04/11/2011 <br />LABOR <br />Engineering Technician 2' <br />2 <br />$46.28 <br />$75.58 <br />MIX DESIGN <br />04/11/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD 3 3/4 <br />04/11/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />04/12/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$52.92 <br />$86.43 <br />ESC ROCK PREP <br />04/12/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />MIX DESIGN <br />04/12/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD 3 314 <br />04/12/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDISH DESIGNS <br />04/13/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />ESC ROCK PREP <br />04/13/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />MIX DESIGN <br />04/13/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD 3 3/4 <br />04/13/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDISH DESIGNS <br />04/14/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />ESC ROCK PREP <br />04/14/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />MIX DESIGN <br />04/14/2011 <br />LABOR <br />Engineering Technician 3 <br />3 <br />$78.75 <br />$128.61 <br />WILD 3 3/4 <br />04/14/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />04/15/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />ESC ROCK PREP <br />04/15/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />MIX DESIGN <br />04/15/2011 <br />LABOR <br />Engineering Technician 3 <br />2 <br />$52.50 <br />$85.74 <br />WILD 3 3/4 <br />04/15/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />P4135 Totals <br />$ 5182.67 <br />$ 8464.33 <br />$13647.00 <br />3636213 Materials Testing Total $ 13647.00 <br />36644609 Project Grand Total $ 13647.00 <br />