Lane County <br />Report ID: LBILL001 BILLABLE PROJECT COSTS Page No. 1 <br />Run Date 05/20/2011 <br />Run Time 14:57:28 <br />Billable Project Costs for Fiscal Period 2011 -04 Period begins 04/01/2011 and ends including 04/30/2011 <br />Project: 36644609 AC Mix Verifl Billable HOLD Overhead Rates Applied for this project: Operational (Where applicable) <br />Billed BY: 3636213 Materials Testing Proi: 36644609 <br />P4135 -Mix design <br />TranDate <br />TranlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />03/21/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />MIX DESIGN <br />03/21/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />03/22/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />03/22/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />03/23/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />03/23/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />KR/WILD MIX DESIGN '- <br />03/23/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDISH DESIGNS <br />03/24/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />03/24/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />KR/WILD MIX DESIGN <br />03/24/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDISH DESIGNS <br />03/25/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />03/25/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />WILDISH MIX DESIGN <br />03/25/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />KR/WILD MIX DESIGN -- <br />03/25/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />03/28/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />AC MIX DESIGN <br />03/28/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$52.92 <br />$86.43 <br />WILDISH BATCHING <br />03/28/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L3 L2 AC <br />03/28/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDICH DESIGNS <br />03/29/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />AC MIX DESIGN <br />03/29/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$52.92 <br />$86.43 <br />WILDISH BATCHING <br />03/29/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L3 L2 AC <br />03/29/2011 <br />LABOR <br />Sr Engineering Associate <br />3 <br />$91.02 <br />$148.65 <br />WILDICH DESIGNS <br />03/30/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />AC MIX DESIGN <br />03/30/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />WILDISH BATCHING <br />03/30/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L3 L2 AC <br />03/30/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDICH DESIGNS <br />03/31/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />AC MIX DESIGN <br />03/31/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L3 L2 AC <br />03/31/2011 <br />LABOR <br />Sr Engineering Associate <br />3 <br />$91.02 <br />$148.65 <br />WILDICH DESIGNS <br />04/01/2011 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$79.38 <br />$129.64 <br />WILDISH BATCHING <br />04/01/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L3 L2 AC <br />04/01/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDICH DESIGNS <br />04/04/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$52.92 <br />$86.43 <br />WILDISH AND ESC ROCK PREP <br />04/04/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L2 & L3 AC <br />04/04/2011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />04/05/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />WILDISH AND ESC ROCK PREP <br />04/05/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L2 & L3 AC <br />04/0512011 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$60.68 <br />$99.10 <br />WILDISH DESIGNS <br />04/06/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />ASPHALT MIX DESIGN <br />04/06/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />WILDISH AND ESC ROCK PREP <br />