New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
995522 Alton Baker Irrigation Renovation & Utility Service PAF GJN 4613
COE
>
PW
>
POS_PWM
>
Capital
>
995522 Alton Baker Irrigation Renovation & Utility Service PAF GJN 4613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:24:13 PM
Creation date
2/10/2011 4:40:22 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
004613
GL_Project_Number
995522
Document_Number
995522
Retention_Destruction_Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
31i$TEAdB DEVELOl~14lNT CHARt3~ EXpENpittJRE ALLOCATION WORKSHEET , <br />Project Name: Alton Baker Park Irrigation and Shelter Service Drive Renovation <br />Project Manager Name: Emily Proudfoot <br />Service ID # (e.g. Good Job Number 004161): 4813 Contract # (e.p. ]004-0006): Capital Project # (e.g. 006244): <br />SAC;EirpenaAtkFrf heq'ulr?ements ' <br />Improvement Fees; maybe apent dilly an capital lmprovemente;included in an adopted Capital Improvement Plan that Increase capacity needed to <br />provide service for future users, Including those thatproOil n4wfacIIItle4or Incroas6 the,GapaCity prgY dod by ext8ting fadlllttats. <br />Wastewater Ellglble; Non-assessable components otpro]ects attributable to future development that drain those portions of pipes within the total area served by <br />the project. [Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate basis.] <br />Stormweter Eligible: Non-assessable components of pipe or open channel projects attributable to future development that drain impervious surface areas 1vilhin <br />the total drainage basin served by the project. [Quantity portions of project that are capacity enhancing by determining the percent of project that will serve new' <br />development- The total existing Impervious area of basin divided by the future build-out impervious area of basin equals the percent of project serving existing <br />development. Subtract from 100% to derive the percentage of project that will serve new development.] <br />Transportation Eligible: Non-assessable components attributable to future development off) arterial and collectorstreet projects and related fraftk signals, and <br />2) of-street bicycle path projects. [Quantify portions of project that are capacity enhancing; pro-rate deslgn/constructlon management costs on a proportionate <br />basis. In the case ofmajor enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br />attributed to new development between year of construction and build out]. <br />- ° <br /> <br />Parks Eligible; Components of Neighborhood or Community park projects atir/bufable to future development. [Quantify portions of project that are capectty. <br />enhancing versus those portions needed to serve existing users. Pro-rate design1construction management costs on a proportionate basis.] <br />R~if►tbll►gt)rrieRt Pees they be spent only on capital lprovarnents'Inoludad In an adopted Capital;ImproVamenGRtan.InGluding those for new <br />t8lalltlee,e rehabllitatloiti'of ex{tstln fac,Illtioe, <br />Wastewater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br />Stormwater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve exlsting development). <br />Transportation Eligible; Per Council Resolution No. 4718, reimbursement fees will be budgeted for preservation and malnfenence of the existing system <br />(Council or the Budget Committee may subsequently allocate some or all for a different purpose as allowed by law). No transportation reimbursement SDC <br />revenue is current! attributable to off-street b1c le paths, therefore no reimbursement fee expenditures are allowed for paths. <br />Parks Eligible: No parks SDC revenue Is curremly attributable to a reimbursement fee; therefore no reimbursement fee expenditures ere allowed. <br />i411ocaf)ori ts:&P eiC"ants es of Total Project Costs <br />Pro(eef fnNfatlon PheBe Bid Phase; Flna1 Pk" V <br />` <br />Wastewater Improve. Fee <br />$ <br />% <br />Is, <br />% <br />$ <br />I <br />% <br />Approved Amounts, N different: <br />$ <br />% <br />$ <br />% <br />$ <br />Wastewater Reimburse. Fee- <br />$ <br />Apprav0tl Ainounls, ff different <br />$ <br />% <br />$ <br />etomswaterImprove. Fee <br />$ <br />% <br />$ <br />% <br />$ <br />% <br />Approved Amounts, If different: <br />$ <br />% <br />$ <br />% <br />$ <br />% <br />Btormwstar R6lmburse.Fea~ <br />f. , <br />Approved Amounts, i( different <br />$ <br />u~ <br />$ <br />% <br />$ <br />Transportation improve. Fee <br />$ <br /> <br />% <br />$ <br />% <br />$ j <br />Approved Amounts, if different: <br />$ <br />% <br />$ <br />% <br />$ <br />Transportation Reimburse. Fee <br />$ <br />ry <br />Approved Amounts /dffferenl <br />$ <br />% <br />$ <br />% <br />$ <br />Parks improve Foe <br />$ <br /> <br />$ <br />y <br />Approved Amounts, if ddierarit <br />$ <br />% <br />$ <br />% <br />$ <br />% <br />Parka Roimburaa. Fea <br />$184,260' <br />rye <br />$ iJIA ' ' <br />% <br />$ WA` <br />Approved Am6upta, Ifpifferant <br />9' <br />Expondllure Allocation JuatlticaHorr: <br />Attach docutnentatlon that demonstrates Justl(Ication ofSDCiunding of thle capital projectet project Initiation phase as welt ea at time of any <br />autisaquont rovtalone of SDC'ollocatlon amounts/percentages. <br />state law requires an annual acc untlog.of SDC expenditures by 6ystantat the project iavol.-An$DC expenditure may be.legally ohallengad for up 4o s <br />two years after the expendltU e. , _ <br />Approvad'py <br />r <br /> <br />Date: Z! .O <br />Date: <br />Date. <br />P:1POS_PlenninglPsrkalAaon Baker Park%lMgatlon Renovation ProjectNe16 SOC AAocallon.xls, <br />I <br />Revised March. 2004 <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.