Alton Baker Park Lot 8 Access Road relocation <br />Job #4613 <br />Good Job number estimate <br />12/30/2008 <br />Item <br />Unit . <br />MY <br />Unit Cost <br />Total <br />Site Survey <br />1 <br />Is <br />$ 2,500.00 <br />$ 2,500.00 <br />Design, bid, project mngmt <br />150 <br />hr <br />$ 100.00 <br />$ 15,000.00 <br />Irrigation, Utility upgrades <br />1 <br />Is <br />$ 130,000.00 <br />$ 130,000.00 <br />Shelter access drive upgrade <br />1 <br />Is <br />$ 20,000.00 <br />$ 20,000.00 <br />Subtotal <br />$167,500.00 <br />10% Contingency <br />$ 16.750.00 <br />Grand total <br />$184,250.00 <br />r <br />