Run Date: 12/30/2010 10:30:18 <br />Contractor: EUGENE SAND CONSTRUCTION <br />Job 93-004479 <br />Contract No: 2009-00008 <br />PO 2009100130 <br />Assessable: No <br />Line Description Last Chng Or <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity <br />Amount <br />Page 4 <br />% Complete <br />0383 <br />0390 <br />0400 <br />Stage 2- <br />0410 <br />0420 <br />0430 <br />FIND/REPAIR CONDUIT COUNTER LO 002 <br />LOOP FEEDER WIRE <br />TEMPORARY VIDEO DETECTION INST <br />Sta 97+60 to Beltline <br />MOBILIZATION <br />TEMP. WORK ZONE TRAFFIC CONTRO <br />TEMPORARY STRIPING <br />$1,801.51 <br />$5.00 <br />$5,400.00 <br />$25,000.00 <br />$10,000.00 <br />$2,500.00 <br />LUMPSUM <br />FOOT <br />EACH <br />LUMPSUM <br />LUMPSUM <br />LUMPSUM <br />1.000 <br />210.000 <br />2.000 <br />1.000 <br />1.000 <br />1.000 <br />$1,801.51 <br />$1,050.00 <br />$10,800.00 <br />$25,000.00 <br />$10,000.00 <br />$2,500.00 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />1.000 <br />870.000 <br />3.000 <br />1.000 <br />1.000 <br />1.000 <br />$1,801.51 <br />$4,350.00 <br />$16,200.00 <br />$25,000.00 <br />$10,000.00 <br />$2,500.00 <br />100.00 <br />414.00 <br />150.00 <br />100.00 <br />100.00 <br />100.00 <br />0440 <br />PORTABLE CHANGEABLE MESSAGE SI <br />$3,600.00 <br />EACH <br />2.000 <br />$7,200.00 <br />0.000 <br />$0.00 <br />2.000 <br />$7,200.00 <br />100.00 <br />0450 <br />FLAGGERS <br />$45.00 <br />HOUR <br />600.000 <br />$27,000.00 <br />0.000 <br />$0.00 <br />598.000 <br />$26,910.00 <br />100.00 <br />0460 <br />CITY PROVIDED SPEC INFO SIGNS <br />$150.00 <br />EACH <br />4.000 <br />$600.00 <br />0.000 <br />$0.00 <br />4.000 <br />$600.00 <br />100.00 <br />0470 <br />EROSION CONTROL <br />$1,200.00 <br />LUMPSUM <br />1.000 <br />$1,200.00 <br />0.000 <br />$0.00 <br />1.000 <br />$1,200.00 <br />100.00 <br />0480 <br />REMOVAL OF CURBS <br />$13.00 <br />FOOT <br />10.000 <br />$130.00 <br />0.000 <br />$0.00 <br />20.000 <br />$260.00 <br />200.00 <br />0490 <br />REMOVAL OF CURB AND GUTTER <br />$10.00 <br />FOOT <br />42.000 <br />$420.00 <br />0.000 <br />$0.00 <br />51.000 <br />$510.00 <br />121.00 <br />0500 <br />REMOVAL OF WIDE CURB AND GUTTE <br />$8.00 <br />FOOT <br />240.000 <br />$1,920.00 <br />0.000 <br />$0.00 <br />313.000 <br />$2,504.00 <br />130.00 <br />0510 <br />REMOVAL OF WALKS AND DRIVEWAYS <br />$17.00 <br />SQYD <br />71.000 <br />$1,207.00 <br />0.000 <br />$0.00 <br />81.800 <br />$1,390.60 <br />115.00 <br />0520 <br />ADJUSTING BOXES <br />$220.00 <br />EACH <br />8.000 <br />$1,760.00 <br />0.000 <br />$0.00 <br />1.000 <br />$220.00 <br />13.00 <br />0530 <br />MINOR ADJUSTMENT OF MANHOLES <br />$925.00 <br />EACH <br />7.000 <br />$6,475.00 <br />0.000 <br />$0.00 <br />9.000 <br />$8,325.00 <br />129.00 <br />0540 <br />MH REM/REPL FRAME/COVER-WW <br />$275.00 <br />EACH <br />8.000 <br />$2,200.00 <br />0.000 <br />$0.00 <br />8.000 <br />$2,200.00 <br />100.00 <br />0550 <br />MH REM/REPL FRAME/COVER-ST <br />$275.00 <br />EACH <br />3.000 <br />$825.00 <br />0.000 <br />$0.00 <br />1.000 <br />$275.00 <br />33.00 <br />0560 <br />PAVEMENT REMOVAL <br />$0.90 <br />SQFT <br />50,006.000 <br />$45,005.40 <br />0.000 <br />$0.00 <br />26,273.500 <br />$23,646.15 <br />53.00 <br />0570 <br />SURFACING STABILIZATION <br />$115.00 <br />CUYD <br />96.000 <br />$11,040.00 <br />0.000 <br />$0.00 <br />5.900 <br />$678.50 <br />6.00 <br />0571 <br />SAWCUT & REMOVE AC SURFACE/REP 005 <br />$6,088.00 <br />LUMPSUM <br />1.000 <br />$6,088.00 <br />0.000 <br />$0.00 <br />1.000 <br />$6,088.00 <br />100.00 <br />0580 <br />COLD PLANE PVMT REMOVAL, 0"-2" <br />$0.21 <br />SQFT <br />6,200.000 <br />$1,302.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0590 <br />COLD PLANE PVMT REMOVAL, 1" DE <br />$0.08 <br />SQFT <br />88,000.000 <br />$7,040.00 <br />0.000 <br />$0.00 <br />88,135.000 <br />$7,050.80 <br />100.00 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 012 Final Pay <br />Original Contract: $1,677,137.85 <br />Current Amount: $1,779,706.19 <br />Contract Award Date: 09/12/2008 <br />Completion Date: 06/30/2009 <br />Current Contract <br />Unit Price Unit Measure Quantity <br />