Run Date:-12/30/2010 10:30:18 <br />Contractor: EUGENE SAND CONSTRUCTION <br />Job 93-004479 <br />Contract No: 2009-00008 <br />PO 2009100130 <br />Assessable: No <br />Line Description Last Chng Ord <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 012 Final Pay <br />Original Contract: $1,677,137.85 <br />Current Amount: $1,779,706.19 <br />Contract Award Date: 09/12/2008 <br />Completion Date: 06/30/2009 <br />Current Contract Estimated Payment Cumulative Totals <br />Unit Price Unit Measure Quantity Amount Quantity Amount Quantity <br />Page 3 <br />Complete <br />0190 <br />COLD PLANE PVMT REMOVAL, 2" D <br />$0.09 <br />SQFT <br />42,075.000 <br />$3,786.75 <br />0.000 <br />$0.00 <br />-44,862.500 <br />$4,037.63 <br />107.00 <br />0200 <br />COLD PLANE PVMT REMOVAL, 2.5" <br />$0.05 <br />SQFT <br />262,206.000 <br />$13,110.30 <br />0.000 <br />$0.00 <br />305,670.200 <br />$15,283.51 <br />117.00 <br />0210 <br />LEVEL 3, 1/2" DENSE HMAC <br />$62.00 <br />TON <br />6,511.000 <br />$403,682.00 <br />0.000 <br />$0.00 <br />5,862.400 <br />$363,468.80 M <br />90.00 <br />0211 <br />1/2" LEVEL 2 HMAC PRICE ADJ-OC <br />001 <br />$9.71 <br />TON <br />6,334.530 <br />$61,508.29 <br />0.000 <br />$0.00 <br />6,334.530 <br />$61,508.29 <br />100.00 <br />0220 <br />LEVEL 3, 3/4" DENSE HMAC <br />$75.00 <br />TON <br />1,305.000 <br />$97,875.00 <br />0.000 <br />$0.00 <br />1,303.110 <br />$97,733.25 <br />100.00 <br />0221 <br />3/4" LEVEL 3 HMAC PRICE ADJ-OC <br />001 <br />$9.71 <br />TON <br />1,303.110 <br />$12,653.20 <br />0.000 <br />$0.00 <br />1,303.110 <br />$12,653.20 <br />100.00 <br />0230 <br />CONCRETE CURB AND GUTTER <br />$43.00 <br />FOOT <br />26.000 <br />$1,118.00 <br />0.000 <br />$0.00 <br />25.506 <br />$1,096.50 <br />98.00 <br />0240 <br />CONCRETE WIDE CURB AND GUTTER <br />$110.00 <br />FOOT <br />5.000 <br />$550.00 <br />0.000 <br />$0.00 <br />7.000 <br />$770.00 <br />140.00 <br />0250 <br />CONCRETE WALKS <br />$12.00 <br />SQFT <br />106.000 <br />$1,272.00 <br />0.000 <br />$0.00 <br />112.000 <br />$1,344.00 <br />106.00 <br />0260 <br />TRUNCATED DOME TEXTURING <br />$26.00 <br />SQFT <br />10.000 <br />$260.00 <br />0.000 <br />$0.00 <br />10.000 <br />$260.00 <br />100.00 <br />0270 <br />PVMT LEGEND, TYPE A2 or B: ARR <br />$115.00 <br />EACH <br />30.000 <br />$3,450.00 <br />0.000 <br />$0.00 <br />29.000 <br />$3,335.00 <br />97.00 <br />0280 <br />PVMT LEGEND, TYPE A2 or B: RR <br />$800.00 <br />EACH <br />3.000 <br />$2,400.00 <br />0.000 <br />$0.00 <br />3.000 <br />$2,400.00 <br />100.00 <br />0290 <br />PVMT LEGEND, TYPE A2 or B: BIC <br />$165.00 <br />EACH <br />6.000 <br />$990.00 <br />0.000 <br />$0.00 <br />8.000 <br />$1,320.00 <br />133.00 <br />0300 <br />PVMT LINE, TYPE A2 or B <br />$4.75 <br />SQFT <br />800.000 <br />$3,800.00 <br />0.000 <br />$0.00 <br />705.000 <br />$3,348.75 <br />88.00 <br />0310 <br />MONO-DIRECTIONAL CRYSTAL TYPE <br />$5.00 <br />EACH <br />131.000 <br />$655.00 <br />0.000 <br />$0.00 <br />171.000 <br />$855.00 <br />131.00 <br />0320 <br />BI-DIRECTIONAL YELLOW TYPE I M <br />$5.00 <br />EACH <br />280.000 <br />$1,400.00 <br />0.000 <br />$0.00 <br />309.000 <br />$1,545.00 <br />110.00 <br />0330 <br />THERMOPLASTIC, NON-PROFILE, 90 <br />$38,500.00 <br />LUMPSUM <br />1.000 <br />$38,500.00 <br />0.000 <br />$0.00 <br />1.000 <br />$38,500.00 <br />100.00 <br />0340 <br />REMOVE EXISTING SIGNS <br />$59.00 <br />LUMPSUM <br />1.000 <br />$59.00 <br />0.000 <br />$0.00 <br />1.000 <br />$59..00 <br />100.00 <br />0350 <br />WOOD SIGN POSTS <br />$130.00 <br />EACH <br />1.000 <br />$130.00 <br />0.000 <br />$0.00 <br />3.000 <br />$390.00 <br />300.00 <br />0360 <br />TYPE W1 SIGNS IN PLACE <br />$12.00 <br />SQFT <br />14.000 <br />$168.00 <br />0.000 <br />$0.00 <br />14.000 <br />$168.00 <br />100.00 <br />0370 <br />LOOP DETECTORS INSTALLATION <br />$390.00 <br />EACH <br />62.000 <br />$24,180.00 <br />0.000 <br />$0.00 <br />68.000 <br />$26,520.00 <br />110.00 <br />0380 <br />CONDUIT UNDER HARD SURFACING <br />$64.00 <br />FOOT <br />125.000 <br />$8,000.00 <br />0.000 <br />$0.00 <br />78..800 <br />$5,043.20 <br />63.00 <br />0381 <br />CONTRACTOR DELAYED-CONDUIT INS <br />002 <br />$138.24 <br />LUMPSUM <br />1.000 <br />$138.24 <br />0.000 <br />$0.00 <br />1.000 <br />$138.24 <br />100.00 <br />0382 <br />REMOVE OLD SUBBASE AC-INSTALL <br />002 <br />$4,234.16 <br />LUMPSUM <br />1.000 <br />$4,234.16 <br />0.000 <br />$0.00 <br />1.000 <br />$4,234.16 <br />100.00 <br />Amount <br />