New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2001-00312 Ltrs
COE
>
PW
>
POS_PWM
>
Contracts
>
2011 Contracts scanned to Verify
>
2001-00312 Ltrs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2011 8:43:53 AM
Creation date
12/6/2010 8:57:50 AM
Metadata
Fields
Template:
PW_Contract
COE_Contract_Number
2001-00312
PW_Document_Type_Contract
Correspondence
PW_Department
Public Works
Contract_Administrator
Aanderud
Contract_Manager
Dale, Randal
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Clean all glazing and mullions on shelters, exclusive of sky lights <br />and graphics boxes, three tirres per week. <br />Clean benches and leaning rails three times per week. <br />Remove graffiti on,concrete columns, as needed.: <br />Replace fluorescent light tubes, as needed. <br />Power wash all vertical concrete surfaces up-to two times per year. <br />I <br />Restain benches once a year. <br />Clean gutters.no Tess than two times per year. <br />6. LTD will schedule maintenance so as to not disrupt public or employee use <br />the facility. <br />-7. All chemicals used on the site are to be applied according to manufacturer <br />directions and.in a way which poses no threat to the public, the landscapi <br />or other site amenities. <br />8. LTD will designate one staff person to be responsible for overseeing and <br />coordinating its maintenance program on the project, area. <br />9. LTD may subcontract` the-maintenance of the Eugene Mall Transit Station. <br />10. LTD shall have the right to use the improved Central Transfer Facility <br />indefinitely, or until such time as the City and LTD jointly, agree to <br />move the location of-the station. <br />11. City will not add or,delete improvements from the original construction <br />project, and will not alter specifications contained therein, without the <br />prior approval of LTD.` <br />12. City will carry-out a maintenance program of City-owned property that <br />ensures that the appearance and character of the improved project area ari <br />maintained. <br />EXHIBIT B--Responsibilities of Parties--Page 2 of 3 <br />of <br />-s <br />ng, <br />
The URL can be used to link to this page
Your browser does not support the video tag.