Total: $1,007.72 <br /> <br />Equipment Rental <br />The City of Eugene rented a mini skid steer loader to help expedite loading gravel into the <br />City’s six power wheelbarrows. This cut the time to load gravel significantly, plus made the <br />job of moving gravel much more tolerable. <br />Total: $880.13 <br /> <br />Personal Protective Supplies <br />Gloves, safety glasses, and poison oak protection were purchased as personal protection <br />equipment for this project. <br />Total: $372.21 <br /> <br />Physicals and Drug Screens <br />All 6 crew members were required by the City to have physical examinations and drug <br />Total: $505.00 <br />screens prior to being accepted for employment. <br /> <br />The City of Eugene covered the costs of other equipment, such as six power wheelbarrows, a <br />large chipper, dump trucks, and occasionally a small tractor-loader. The City also covered <br />the maintenance cost to keep the power wheelbarrows operational for the trail work. Also, as <br />mentioned above, there were over 200 hours of City staff time used for this program. <br /> <br />Indirect <br />Indirect costs are included in the tax/fringe portions of the budget for project oversight, crew <br />leaders, and crew members. Total: $0 <br /> <br />Total Expenses: $29,363.60 <br />