New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-05423 Budget Narrative
COE
>
PW
>
POS_PWM
>
Contracts
>
2010 Contracts scanned to Verify
>
2010-05423 Budget Narrative
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2011 12:33:05 PM
Creation date
9/27/2010 8:59:00 AM
Metadata
Fields
Template:
PW_Contract
COE_Contract_Number
2010-05423
PW_Document_Type_Contract
Correspondence
Contract Status
Inactive
Organization
OYCC Grant 570
PW_Department
Public Works
Contract_Administrator
Aanderud
Contract_Manager
Clark, John
Is Permanent?
No
Retention_Destruction_Date
1/1/2021
External_View
No
Supplemental fields
GL_Grant
676
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Total: $1,007.72 <br /> <br />Equipment Rental <br />The City of Eugene rented a mini skid steer loader to help expedite loading gravel into the <br />City’s six power wheelbarrows. This cut the time to load gravel significantly, plus made the <br />job of moving gravel much more tolerable. <br />Total: $880.13 <br /> <br />Personal Protective Supplies <br />Gloves, safety glasses, and poison oak protection were purchased as personal protection <br />equipment for this project. <br />Total: $372.21 <br /> <br />Physicals and Drug Screens <br />All 6 crew members were required by the City to have physical examinations and drug <br />Total: $505.00 <br />screens prior to being accepted for employment. <br /> <br />The City of Eugene covered the costs of other equipment, such as six power wheelbarrows, a <br />large chipper, dump trucks, and occasionally a small tractor-loader. The City also covered <br />the maintenance cost to keep the power wheelbarrows operational for the trail work. Also, as <br />mentioned above, there were over 200 hours of City staff time used for this program. <br /> <br />Indirect <br />Indirect costs are included in the tax/fringe portions of the budget for project oversight, crew <br />leaders, and crew members. Total: $0 <br /> <br />Total Expenses: $29,363.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.