Contractor: RJ Consulting Services <br />Date Work Order Issued: July 14, 2008 <br />Not -to- Exceed Date of Completion: July 31, 2008 <br />Not -to- Exceed Cost: $600 <br />Scope of Work for this Work Order: <br />1. Work Location This work will be conducted at the Delta Ponds natural area. <br />The site can be accessed by taking Goodpasture Island Road from either Valley <br />River Center Drive to the south or Delta Highway to the north. See the attached <br />map for specific locations and suggested parking. <br />2. Objective Mow blackberries along the top of bank on the east side of - - <br />Goodpasture Island Road. Also, mow blackberry and other weeds in triangle to <br />the east and south of bike path intersection. <br />3. Specific Instructions Mow blackberries along the top of the bank from the south <br />end of the area mowed in the June 19 work order to the southern gravel pull out. <br />Mow as far as is safe to the edge of the slope. Along the bike path mow <br />blackberries and other weeds between the bike path and fence. Please give bike <br />path users right away and use flaggers if necessary to protect pedestrians from <br />flying debris. <br />If any turtles or turtle nests are encountered during mowing, cease work and <br />notify the Natural Resources Coordinator immediately at 541- 968 -4156. <br />CITY OF EUGENE CO CTOR <br />I I <br />Lauri Mullen Ich wen <br />Natural Resources Coordinator Owner <br />City of Eugene RJ Consulting Services <br />Date: 7 / / tK Date: <br />