4 <br />ti <br />Contractor: RJ Consulting Services <br />Date Work Order Issued: June 19, 2008 <br />Not -to- Exceed Date of Completion: July 31, 2008 <br />Not -to- Exceed Cost: $2,000 <br />Scope of Work for this Work Order: <br />1. Work Location This work will be conducted at the Delta Ponds natural area. <br />The site can be accessed by taking Goodpasture Island Road from either Valley <br />River Center Drive to the south or Delta Highway to the north. See the attached <br />map for specific locations and suggested parking. <br />2. Obiective Mow blackberries, Scotch broom and other invasive nonnative <br />-- vegetation. -- - <br />3. Specific Instructions Mow blackberries, Scotch broom and other invasive <br />nonnative vegetation in the areas indicated on the attached map. In area 1, mulch <br />two existing piles of woody debris to disperse mounds. Unless under power lines, <br />take care to leave native seedling trees in these areas. <br />CITY OF EUGENE <br />Lauri Mullen <br />Natural Resources Coordinator <br />City of Eugene <br />Date: 1 � G 1 I' L Date: L 2 A <br />RJ Consulting Services <br />