Run Late: 07/02/2010 16:13:05 <br />Contractor: KIPCO, INC. <br />Job 93-004671 <br />Contract No: 2010-00023 <br />PO 2010100297 <br />Assessable: No <br />Line Description Last Chng Or <br />Current Contract <br />Unit Price Unit Measure Quantity <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity <br />Page 3 <br />Complete <br />0210 <br />CATCH BASINS, W/BIKE PROOF GR <br />$1,015.00 <br />EACH <br />5.000 <br />$5,075.00 <br />2.000 <br />$2,030.00 <br />2.000 <br />$2,030.00 <br />40.00 <br />0220 <br />FILLING ABANDONED STRUCTURES <br />$340.00 <br />EACH <br />1.000 <br />$340.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0230 <br />CONNECT EXIST PIPE - STM <br />$160.00 <br />EACH <br />11.000 <br />$1,760.00 <br />4.000 <br />$640.00 <br />9.000 <br />$1,440.00 <br />82.00 <br />0240 <br />ABANDONED PIPES- PLUG END <br />$165.00 <br />LUMPSUM <br />1.000 <br />$165.00 <br />0.000 <br />$0.00 <br />1.000 <br />$165.00 <br />100.00 <br />0250 <br />LEVEL 1, 1/2" DENSE HMAC <br />$145.00 <br />TON <br />135.000 <br />$19,575.00 <br />0.000 <br />$0.00 <br />156.350 <br />$22,670.75 M <br />116.00 <br />0260 <br />PLAIN CONCRETE PVMT, DOWELED, <br />$6.90 <br />SQFT <br />1,878.000 <br />$12,958.20 <br />166.000 <br />$1,145.40 <br />3,641.000 <br />$25,122.90 M <br />194.00 <br />0270 <br />6" CONCRETE CURBS <br />$25.00 <br />FOOT <br />12.000 <br />$300.00 <br />23.000 <br />$575.00 <br />23,.000 <br />$575,.00 <br />192.00 <br />0280 <br />CONCRETE SIDEWALK RAMPS <br />$985.00 <br />EACH <br />1.000 <br />$985.00 <br />1.000 <br />$985.00 <br />1.000 <br />$985.00 <br />100.00 <br />0290 <br />CDF BACKFILL-15TH AVENUE 002 <br />$759.50 <br />LUMPSUM <br />1.000 <br />$759.50 <br />1.000 <br />$759.50 <br />1.000 <br />$759.50 <br />100.00 <br />0300 <br />OVER EXCAVATION 002 <br />$100.00 <br />LUMPSUM <br />1.000 <br />$100.00 <br />1.000 <br />$100.00 <br />1.000 <br />$100.00 <br />100.00 <br />$121,684.50 <br />$12,876.92 <br />$134,873.56 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 002 Final Pay <br />Original Contract: $120,195.00 <br />Current Amount: $121,684.50 <br />Contract Award Date: 05/14/2010 <br />Completion Date: 06/11/2010 <br />Amount <br />