00990.90 General <br />(ADD) <br />Pay Item <br />Unit of Measurement <br />(h) <br />1-112 In Electrical Conduit <br />Foot <br />(i) <br />2 In Electrical Conduit <br />Foot <br />(j) <br />2-1/2 In Electrical Conduit <br />................................Foot <br />(k) <br />3 In Electrical Conduit <br />...................................Foot <br />(1) <br />Concrete Junction Box .............................................Each <br />(m) <br />Loop Detector Installation .....Each <br />(ADD) Item (h), (i), 0) and (k) includes payment for furnishing and installing conduit, as <br />identified in the plans. Surfacing, such as concrete walks and asphalt concrete <br />pavement shall be paid incidental. Resurfacing work shall be in accordance with <br />project plans and specifications, and the City of Eugene Publication, "Utility and <br />Right-of-Way Permits Construction Within and Use of the Public Way". <br />(ADD) Item (1) includes payment for all Work to furnish and install Junction Boxes, as <br />identified in the plans or directed by the Engineer, including connecting to new or <br />existing conduit, splices, and resurfacing. <br />(ADD) 'Item (m) includes payment for all Work to install loop detectors, including the <br />homeruns. <br />Special Provisions - Job Vs 4637 and 4435 <br />