New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4586 Knife River 2010-00024
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4586 Knife River 2010-00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:35:47 AM
Creation date
6/10/2010 11:21:46 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004586
GL_Project_Number
995384
COE_Contract_Number
2010-00024
Retention_Destruction_Date
8/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HMAC transitions around the structures. Millings from cold plane pavement <br />removal shall not be used to construct these transitions. <br />00490.46 Adjusting Manholes <br />(c) Raising Tops of Manholes <br />(ADD) When adjusting wastewater manholes to grade, replace the frames and covers of <br />the following manholes, per City Standard Drawings. <br />Wastewater manholes numbers: 9558, 9580, 9581, 9593, 9607, 9608, 9609, <br />9610, 12319, 12320, 12321, 12323 and 13481. <br />When adjusting stormwater manholes to grade, replace the frames and covers of <br />the following manholes, per City Standard Drawings. <br />Stormwater manholes numbers: 62750, 62751, 62752, 62753, 62754, 62755, <br />62756, 62757, 62758, 62761, 62773, 62774, 62775, 62776, 62778 and 69104. <br />Locations of manhole frames and covers to be replaced may be modified as <br />directed by the Engineer. <br />Aluminum frames and covers identified for removal and replacement shall be <br />salvaged and will remain the property of the City of Eugene. The Contractor shall <br />deliver salvaged aluminum frames and covers to City of Eugene Public Works <br />Maintenance, 1820 Roosevelt Blvd., during normal business days, between the <br />hours of 7:30 am and 2:00 pm. The Contractor shall call 541-682-4838 one (1) <br />business day prior to delivery to coordinate with City staff. <br />00490.48 Adjusting Boxes, Cleanout Lids and Similar Structures <br />(ADD) Adjust water valve boxes in accordance with EWEB specifications attached. <br />00490.90 Unit Basis <br />(ADD) The bid items "MH REM/REPL FRAME/COVER-WW" and MH REM/REPL <br />FRAME/COVER-ST" are for material and procurement costs only. Removal and <br />replacement of manhole frames and lids shall be performed during the manhole <br />adjustment operation and payment for this Work shall be included in the <br />applicable bid item for adjustment of manholes. <br />Payment for items (a) and (d) shall be payment in full for all Work required at <br />each location, including lowering, regardless of the number of separate <br />operations performed. <br />00495.90 Payment - <br />(ADD) Replacing asphalt pavement for trench resurfacing will be paid as WMAC <br />according to 00745.90. <br />Special Provisions Job #4586 Paqe 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.