New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4617 4583 4644 Eugene Sand Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4617 4583 4644 Eugene Sand Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 3:45:31 PM
Creation date
5/18/2010 11:00:12 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004583
GL_Project_Number
995354
COE_Contract_Number
2010-00020
Retention_Destruction_Date
10/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
00490.90 Unit Basis <br />(ADD) The bid items "MH FRAME/COVER-WW" and "MH FRAME/COVER-ST" are for <br />material and procurement costs only. Removal and replacement of manhole <br />frames and lids shall be performed during the manhole adjustment operation and <br />payment for this Work shall be included in the applicable bid item for adjustment <br />of manholes. <br />Payment for items (a) and (d) shall be payment in full for all Work required at <br />each location, including lowering, regardless of the number of separate <br />operations performed. <br />00620.40 Pavement Removal <br />(d) Pavement Removal Alternative <br />(DELETE) The sentence beginning "Longitudinal drop-offs..." <br />(ADD) Longitudinal drop-offs of more than three (3) inches require a wedge. Traffic <br />shall not be allowed to cross drop-offs of more than three (3) inches until wedges <br />are in place. At intersections, drop-offs of more than one (1) inch require a <br />wedge. Wedges shall be constructed of temporary WMAC or HMAC. Millings <br />from cold plane pavement removal shall not be used to construct these <br />transitions. <br />00620.43 Maintenance Under Traffic <br />(ADD) Areas of Cold Plane Pavement Removal greater than 3" deep shall be paved <br />back to within 2" of finished grade within the same Work day as the cold plane <br />pavement removal. <br />00705.11 Emulsified Asphalt <br />(ADD) (c) Seal Coat <br />Provide Tire Rubber Modified Surface Sealer (TRMSS), manufactured by Wright <br />Asphalt, ph 541-729-5443, Steelguard Asphalt Sealcoat System manufactured <br />by Carbonyte Systems, Inc., ph 916-387-0316, or approved equal. <br />00705.00 Scope <br />(ADD) The seal coat referred to in these Specifications is a treatment applied to existing <br />asphalt concrete pavement surfaces to seal and protect the pavement surface. <br />00705.41 Preparation of Foundation for Prime Coat <br />(ADD) (a) Preparation of Surface for Seal Coat <br />Remove all reflectors, delineators, and other surface mounted' materials within <br />the Seal Coat treatment area prior to application. <br />Special Provisions Job #'s 4583, 4617 and 4655 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.