Any tree within the project limits damaged by the Contractor due to negligence <br />shall be evaluated by a City Arborist. If that evaluation determines that the action <br />will cause death or substantial damage, the Contractor shall be required to pay <br />the City an amount sufficient to fund the planting and establishment by the City of <br />a tree of similar value. The value of the existing street tree shall be calculated <br />using the plant appraisal method established by the Council of Tree and <br />Landscape Appraisers. Tree damage such as trunk scoring or broken limbs or <br />damaged roots inside the Critical Root Zone will be assessed according to the <br />percentage of loss of tree value per City of Eugene Code <br />00310.49 Removal Work <br />(ADD) (f) 'Pavement Removal <br />Coordinate Pavement Removal operations to comply with Section 00220. <br />Pavement may be removed by cold plane operations where full thickness of <br />existing pavement is to be removed, if approved by the Engineer. Where <br />pavement is removed by excavation, edges of excavation shall be sawcut or <br />wheelcut. <br />(ADD) 00310.83 Pavement Removal <br />Pavement removal completed and accepted will be measured in place by the <br />square foot. The thickness of pavement removal as shown on the plans is an <br />estimate and shall be considered approximate only. No guarantee is made that <br />the actual thickness will be the same as the estimated thickness. <br />00310.92 Separate Unit Basis <br />(ADD) Pay Item Unit of Measurement <br />(g) Pavement Removal ..................................Square Foot <br />(ADD) Where pavement removal is indicated on the plans, all Work required to remove <br />and dispose of existing pavement as specked will be made at the Contract price <br />per square foot for the item "Pavement Removal". No extra payment will be <br />made if the pavement thickness removed varies from what is shown or specified. <br />Removal of aggregate base or subgrade in addition to pavement in order to <br />reach the specified. pavement removal thickness. shall be incidental. <br />For item (g) replacing WMAC and concrete pavement will be paid for according <br />to 00745.90, and 00756.90 as applicable. <br />(ADD) Sawcutting and wheelcuttirig shall be incidental to this item of Work. <br />00350.90 Square Unit Basis <br />(DELETE) The entire section. <br />(ADD) Subgrade geotextile shall be incidental. <br />Special Provisions Job 9s 4583, 4617 and 4655 Page 7 <br />