SPECIAL PROVISIONS FOR <br />2010 PAVEMENT PRESERVATION PROGRAM <br />HAWKINS LANE FROM W 18TH AVENUE TO 100' SOUTH OF VIDERA DRIVE - JOB #4583 <br />33`d AVENUE FROM HILYARD STREET TO WILLAMETTE STREET - JOB #4617 <br />OAKWAY ROAD FROM CAL YOUNG ROAD TO FAIRWAY LOOP - JOB #4655 <br />All number references in these Special Provisions shall be understood to refer to the Sections <br />and subsections of the Standard Specifications and Supplemental Specifications bearing like <br />numbers and to Sections and subsections contained in these Special Provisions in their entirety. <br />CLASS OF WORK <br />00120.15 Examination of Work site and Solicitation Documents; Consideration of <br />Conditions to be Encountered <br />(ADD) Inquiries regarding the plans, specifications, and contract documents shall be <br />made to: Matthew Rodrigues - (541) 682-6036 <br />00150.50 Cooperation with Utilities <br />(Add) (f) Utility Information: <br />This Project is located within the Oregon Utility Notification Center area which is <br />a Utilities notification system for notifying owners of Utilities about Work being <br />performed in the vicinity of their facilities. The Utilities notification system <br />telephone number is 1-800-332-2344. <br />Utility <br />Contact Person's <br />Name and Phone Number(s) <br />1. <br />EWEB Water/Steam <br />2. <br />EWEB Electrical <br />3. <br />Comcast <br />4. <br />Qwest <br />5. <br />Northwest Natural <br />Rod Wade <br />Rich Deluna <br />Tom Henerty <br />Lenny D'Ambrosia <br />Bill Elder <br />00150.55 Cooperation with Other Contractors <br />541-685-7122 <br />541-341-8522. <br />cell 541-228-1884 <br />office 541-484.3605 <br />541-484-8952 <br />cell 503-931-3865 <br />(ADD) Brown Contracting will be reconstructing the intersection of 29th Avenue and <br />Willamette Street (GJN 4513); the completion date for this project is July 30, <br />2010. The Contractor shall not route trucking through the 29th Ave. and <br />Willamette Street intersection until substantial completion of this project (GJN <br />4513), defined as issuance of the second notification. <br />00180.40 Limitations of Operations <br />(ADD) Where top lift paving will occur over areas of Asphalt Concrete Pavement Repair <br />or Pavement Removal, top lift paving shall not be performed until at least one (1) <br />Work day after completion of the Asphalt Concrete Pavement Repair and <br />Pavement Removal Work. <br />Special Provisions Job Vs 4583, 4617 and 4655 Page 1 <br />