Sediment Removal <br />Existing stormwater facilities shall be monitored during the contractor's construction activities. <br />The Contractor shall, when directed by the Engineer, remove any sedimentation / debris, <br />associated with their construction activities, that has been allowed to enter these existing <br />stormwater facilities. <br />The Contractor shall remove any sedimentation / debris, associated with their construction <br />activities, that has accumulated in the sump, and lines of newly constructed stormwater facilities <br />connected to the City's stormwater system, by the end of the work day if construction is <br />occurring during the wet season work period ( October 15 - April 30 ) or when directed by the <br />engineer. <br />Saw Cutting Slurry <br />All waste generated from saw cutting shall be vacuumed immediately behind the saw cutting. <br />operation, and disposed of as approved by the engineer. <br />Additional Best Management Practices <br />1. Sweep all streets in work area nightly after working in area. <br />2. Construction debris and garbage will be disposed of properly at the end of every <br />workday. <br />3. Concrete work will occur in a manner such that no concrete is allowed to enter the city <br />storm system, or natural resources. Concrete wash areas shall be constructed whenever <br />possible, method of containment shall be straw bales lined with visqueen. <br />Project Contacts: <br />City contacts for these projects shall be the project managers for the individual projects. <br />City Project Manager: <br />Terry Colvin <br />(541) 682-5398 <br />Erosion Prevention Staff <br />(541) 682-8423 <br />(541) 682-8471 <br />Spedal Provisions - Job #4671 Page 10 <br />