New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4671 Kipco Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4671 Kipco Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:49:43 PM
Creation date
5/18/2010 11:00:09 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004671
GL_Project_Number
905186
COE_Contract_Number
2010-00023
Retention_Destruction_Date
1/31/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In the event that trees are damaged when a City Arborist is not on-site, the <br />Contractor shall stop Work which may result in further damage to trees and make <br />a request for a City Arborist to the Inspector. All Work which may further damage <br />trees shall be stopped until a City Arborist can make on-site mitigation <br />recommendations and provide on-site Work if needed. <br />Any tree within the project limits damaged by the Contractor due to negligence <br />shall be evaluated by a City Arborist. If that evaluation determines that the action <br />will cause death or substantial damage, the Contractor shall be required to pay <br />the City an amount sufficient to fund the planting and establishment by the City of <br />a tree of similar value. The value of the existing street tree shall be calculated <br />using the plant appraisal method established by the Council of Tree and <br />Landscape Appraisers. Tree damage such as trunk scoring or broken limbs or <br />damaged roots inside the Critical Root Zone will be assessed according to the <br />percentage of loss of tree value per City of Eugene Code <br />00310.41 Removal Work <br />(ADD) (f) Pavement Removal <br />Coordinate Pavement Removal operations to comply with Section 00220. <br />Pavement may be removed by cold plane operations where full thickness of <br />existing pavement is to be removed, if approved by the Engineer. Where <br />pavement is removed by excavation, edges of excavation shall be sawcut. <br />(ADD) 00310.83 Pavement Removal <br />Pavement removal completed and accepted will be measured in place by the <br />square foot. The thickness of pavement removal as shown on the plans is an <br />estimate and shall be considered approximate only. No guarantee is made that <br />the actual thickness will be the same as the estimated thickness.. <br />00310.80 Measurement <br />Removal of inlets includes only those inlets with standard boxes and sumps. <br />Removal of catch basins on 17th and Villard without sumps or standard boxes <br />are incidental to the item "Concrete Pavement Removal". <br />00310.92 Separate Unit Basis <br />(ADD) Pay Item Unit of Measurement <br />(g) Asphalt Pavement Removal Square Foot <br />(h) Concrete Pavement Removal Square Foot <br />(ADD) Where pavement removal is indicated on the plans, all Work required to remove <br />and dispose of existing pavement as specified will be made at the Contract price <br />per square foot for the item (g) or (h) as appropriate. No extra payment will be <br />made if the pavement thickness removed varies from what is shown or specified. <br />Removal of aggregate base or subgrade in addition to pavement in order to <br />reach the specified pavement removal thickness shall be incidental. After <br />excavation place 1 Y2" - 0 aggregate backfill as necessary to bring base rock to <br />required elevation to receive paving. <br />Special Provisions -Job #4671 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.