Storm Rehabilitation 2010 / # <br />Item <br />Direct cost <br />Cost quart. <br />Unit <br />Engineering <br />25.00% <br />Permitting <br />5.000/0 <br />Staff Support <br />0.00% <br />$5,000.00 <br />Bid/ Docs / Warnty <br />0.00% <br />$3,000.00 <br />Coburg Rd near Oakway Mall <br />Mobilization <br />$8,000.00 <br />Traffic Control <br />58;000.00 <br />Erosion Control <br />52,000.00 <br />12" Pipe <br />$250.00 <br />25 <br />If <br />Catchbasin <br />$550.00 <br />1 <br />ea <br />Connection <br />$3,000.00 <br />1 <br />ea <br />Site total construction cost <br />11th at Chambers <br />Mobilization <br />58,000.00 <br />Traffic Control <br />$8,000.00 <br />Erosion Control <br />$2,000:00 <br />12" Pipe <br />$250.00 <br />15 <br />If <br />Catchbasin <br />$550.00 <br />1 <br />t+a <br />Connection <br />$3,000.00 <br />1 <br />ea <br />site total construction cost <br />j 17th and Villard <br />Mobilization <br />$8,000.00 <br />Traffic Control <br />$8,000.00 <br />Erosion Control <br />$2,000.00 <br />10" Pipe <br />$100.00 <br />100 If <br />SD Manhole <br />$2,500.00 <br />2 ea <br />Catchbasin <br />$1.500.00 <br />5 ea <br />ADA Retrofit <br />$450.00 <br />3 ea <br />Site total construction cost <br />Sub total <br />$64,362.50 <br />$32,375.00 <br />$6,000.00 <br />$3,000.00 <br />$8,000.00 <br />$8,000.00 <br />$2,000.00 <br />$0.00 <br />$6,250.00 <br />$550.00 <br />$3,000.00 <br />$27,800.00 <br />$8,000.00 <br />$8,000.00 <br />$2,000.00 <br />$0.00 <br />$3,750.00 <br />$550.00 <br />$3,000.00 <br />525,300:00 <br />$8,000.00 <br />$3,000.00 <br />51;200.00 <br />$0.00 <br />$10,000.00 <br />$6,000.00 <br />$7,500.00 <br />$1,350.00 <br />$36,050.00 <br />4 <br />